My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3222 LOMBARD AVE BASE FILE 2016-01-01 MF Import
>
Address Records
>
LOMBARD AVE
>
3222
>
BASE FILE
>
3222 LOMBARD AVE BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2017 9:03:40 AM
Creation date
2/17/2017 8:02:28 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
3222
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" ' PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City S!andard 5601. <br /> �5;i Connect side sewer per City Standard #'s 601, 602, 604. <br /> � Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided tur this Iot. <br /> S. Roo(top runoff must be discharged to a roof downspout infiliration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size lrench is 3.5'wide, 2'deep and 25' long. See atfachmenl for <br /> more details. <br /> .--.. <br /> L9J,i The contractor must meet with the Public Works Inspeclor to discuss potenlial drainage routing pr�.to <br /> beginning the pro'ect.� � <br /> 10. Install erosion control measures as determined b�the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> I 11� Install erosion control measures per Cily of Everett Standards for small parcels <br /> ( 12. l Remove erosion control measures upon completion of the project prior to final approval of the pemiit. <br /> \ . <br /> �13. '1 All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> ✓ permilted sile. No wasfing of material is allowed on lhis building lot. <br /> ( 14.) No din, mud, rocks or debris to be tracked onlo roadway. <br /> ',15; No buildinc� materials to be stacked on sidewalks and sideH�alks to be kepl dean and open for <br /> pedestrian travel. <br /> 16. i Adjust�vater meter 6ox 1" ahove sidewalk grade. <br /> � 17.,' Remove and replace curb, gulter and sidewalk as per Cily of Evereit Standard Plan #'s 305A 8 306 on <br /> ' this proposal's frontage as directed by lhe Public Works Inspeclor (i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standard #307. <br /> f��y <br /> � 19. Pave driveway from the(reat�property line out to the street paving. <br /> 20. Contact the Water District for connecting provisions for this building's water and <br /> sewer services. <br /> �� I �1; A catch basin as per Citv Standard Plan#402 with a gas trap per Standard Plan #410 i: required for the <br /> Iparking area. <br /> � 22. !r a sewer pump system is to be installed, the pressur� line must discharge into a private manhole, ihen <br /> gravity flow across the public right-of-way. <br /> 23. A sprinkler system is reGuired for this building in compliance with lhe requirements of NFDA Standards <br /> 13D. <br /> �OR PUBLIC WORKS INSPECTION, CALL RANDY AT 425-339-7403 /CLIFF AT 425-339-7404 <br /> P�.���c,n,_.,,s �'� <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.