Laserfiche WebLink
INSPECTION REPORT <br />Date 6- 2 Permit: <br />Contractor: l/ -J � <br />G! Owner: <br />Site <br />ELECTRICAL <br />❑ Tomp Service <br />❑ Groundwork <br />❑ Slab/Conduit <br />❑ Rough In <br />❑ Service <br />Grounding <br />❑ Ceiling Grid <br />❑ Electrical Final <br />SITE WORK <br />❑ Footing d ins <br />[]Root dr ms <br />TYPE OF INSPECTION REQUESTED <br />BUILDING <br />MECHANICAL <br />L]UFFR ground <br />;] Groundwork/Slab <br />❑ Footing <br />❑ Rough In <br />Foundation <br />❑ Ceiling Grid <br />❑ Structural Slab <br />❑ OK to insulate <br />❑ Framing <br />❑ Rooftop Units <br />`64 Insulation <br />❑ Mechanical Final <br />❑ Drywall Nailing <br />❑ Shear Nailing <br />❑ Root Nailing <br />❑ Ceiling Grid <br />❑ Building Final <br />OR CONSULTATION: ___.. <br />GAS PIPE <br />❑ Rough In/Service <br />❑ Refrigeration <br />Gas Pipe Final <br />PLUMBING <br />❑ Groundwork/Sab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK to insulate <br />❑ Water Sr vice <br />Medical Gas <br />Plumbing Final <br />Hot Water Tank <br />_7j Rough in <br />❑ HWT Final <br />APPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED El <br />OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION' <br />❑ CALL (425) 257.8881 FOR REINSPECTION — 24 hour notice required <br />Date:— <br />itt c+ra3M, N. <br />