Laserfiche WebLink
it connects to the City sta 'rr��asn, <br />where storm drain'connects to City. <br />Sewer a catch basin sh, 1 be installed. <br />Provide top ana invert elevations. See <br />. <br />Plot Plan Plan Check'Set #2. <br />J.J. <br />22. <br />Show on plan size and location of water <br />service and meter. See Plan Check Set <br />#.2. <br />J.J. <br />23. <br />Specify type of hard surfacing of the <br />parking area. <br />J.J. <br />24. <br />Indicate on Plan width and length of <br />parking stalls. <br />J.J. <br />25. <br />Show existing sidewalk, curb, and gutter <br />pattern on Plot Plan. <br />J.J. <br />26. <br />L. <br />6 3/4"x9" G.O. Beams appear to be over- <br />stressed. Please provide structural <br />calculations showing dead.and live loads <br />(consider L.W. concrete). <br />J.J. <br />27. Post and beam connections shall be <br />designee} considering uplifting. J.J. <br />28. Provide a cross section through all <br />rockeries and retaining walls retaining <br />more than 35 inches of earth. <br />Page 3 Of 3 <br />