Laserfiche WebLink
�_ <br />CLOSED CM AORR ORDERS REPORT <br />Total Utility Maintenance Management System page 1 <br />O5/15/1997 <br />Date Range :O1/09/1989 - 05/15/1997 <br />CM Work Order Range :1Q01091070001 - 8401Q86700001Pattern :71C�1196751061 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program F.LL F�inction ALL Activity AI�L <br />CM WORK ORDER I�: 7101196751061 Title: REPAIR 5601 LOMBARD <br />«DUPLICATE PRII4'TING OF THIS WORK ORDER» <br />Item ID: WS0585E079 -- 4JATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 04/25/1997 <br />Overall Craft: <br />Zssued: 04/24/1997 <br />out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />:;tatus: <br />Labor: <br />CraFt ID <br />UL CSG <br />UL DMJ <br />UL WTE <br />�Yaterials: <br />ID <br />ADAP34000547 <br />ADAP34000647 <br />BOX000056247 <br />BUSH34118547 <br />COUP36143547 <br />ELL034104247 <br />N/A <br />NIPP34131247 <br />PIPE34060647 <br />SETT34149747 <br />Vehicles: <br />ID <br />V2117 <br />V2230 <br />VH0003 <br />Issued by: WMW Assiqned te: <br />Priority: Tr.avel Time: 0.00 Hr. <br />Ivame <br />------------------ <br />CAVANP.H, SHAN� G. <br />DOUCET'iE, MARK J <br />WESTVANG, TERRY E. <br />Planned Hrs Actual Hrs Cost <br />-----• ----------- ---------- ---------- <br />0.00 4.00 53.92 <br />0.00 4.00 63.12 <br />0.00 4.00 03.12 <br />Total Labor Cost: 180.16 <br />Description <br />------------------------------- <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAF�TER 3/4" FIP X INSTA-•TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />BUSHING 1" X 3/4" BRASS � <br />COUPLING 1" CTN X?/4" MIP @ <br />ELi :;/4" 90 DEG STREET BP.ASS � <br />3/4"FIP X HOSE (MATT) <br />NIPPLE 3/4" CLOSE BRASS <br />PIPE 3/4" POLY I.P.S. <br />SETTfiR COP 5/8" X 3/4" (A7") <br />Date � Used Cost <br />-------- --------- ---------- <br />04/24/1997 3 25.11 <br />04/24/1997 2 15.08 <br />04/24/1997 1 12.89 <br />04/24/1997 1 1.09 <br />04/24/1997 1 4.52 <br />pq /�af 1997 2 3. 02 <br />Q4�/199�7 — i 0•� <br />04/24/1997 1 0.79 <br />04/24/1997 2 0.46 <br />04/24/1997 1 38.53 <br />Total Material Cost: 101 79 � <br />Descripticn Hours Cost <br />-----------------------------�- ------ -------- <br />91 CHEV 1-TON HYD UNIT 4.00 21.20 <br />91 FORD F800 DUMP ` YARD 4.00 43.20 <br />94 CAT BACKHOE 4.00 96.80 <br />ToYa]. Vehicle Cost: 161.20 <br />