Laserfiche WebLink
� <br />CIASED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />07/26/1994 _ Page 1 <br />________________________________________________________________________________ <br />Date Range :07/O1/1992 - 07/26/1994 <br />CM Work Order Range :<Blank> - 8405421080229 Pattern :7401196750932 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7401196750932 Title: REPAIR 5628 LOMBARD �QJ� <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WSOSS5E080 -- WATER SERVICE <br />Location ID: __ <br />Program 740 Function 119 Activity 675 <br />Date Completed: 07/07/1994 <br />Overall Craft: <br />Issued: 07/06/1994 <br />out of Service? NO <br />Meter Reading: <br />Downtime: C hours <br />Status: <br />Labor: <br />Craft ID <br />l7L SRJ <br />WST WDT <br />Materials: <br />ID <br />ADAP34000347 <br />ADAP34000547 <br />ADAP34000647 <br />COUP34101847 <br />COUP34142747 <br />COIIP34142847 <br />NIPP34131247 <br />PIPE34060647 <br />Vehicles: <br />ID <br />V2117 <br />V2146 <br />Issued by: SKL Assigned to: <br />Piiority: Travel Time: 0.00 Hr. <br />Name Planned Hrs Actual Hrs Cost <br />---------------------------- ----------- <br />---------- ---------- <br />STENSETH, ROBERT J. 0.00 3.00 44.10 <br />WALDEN, DAROLD T. 0.00 3.00 58.32 <br />Total Labor Cost: 102 42 <br />Description <br />ADAPTER 3/4" CST X INSTA-TITE@ <br />ADA?TER 3/4" MIP X INSTA-TITE@ <br />ADAPTER 3/4" FIP X INSTA-TITE@ <br />COUPLING 3/4" THREADED BRASS " <br />COUPLING 3/4" CTS COMP X MIPT@ <br />COUPLING 3/4" CTN X 3/4" MIP @ <br />NIPPLE 3/4'� CLOSE BRASS ' <br />PIPE 3/4" POLY I,p,S, <br />Description <br />------------------------ <br />CHEV 1 TON �91 <br />SVC TRUCK CHEV 87 <br />Date <br />07/14/1994 <br />07/06/1994 <br />07/14/1994 <br />07/06/1994 <br />07/14/1994 <br />07/06/1994 <br />07/06/1994 <br />07/14/1994 <br /># Used <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />10 <br />Total Material Cost: <br />Date Hours <br />07/06/1994 3.00 <br />07/06/1994 3.00 <br />Total Vehicle Cost: <br />Cost <br />7.90 <br />7.80 <br />7.13 <br />1.10 <br />5.67 <br />2.97 <br />0.66 <br />2.50 <br />35.73 <br />Cost <br />17.40 <br />15.60 <br />33.00 <br />Total cost for work order 7401196750932: 171.15 <br />