Laserfiche WebLink
r <br />� <br />CLOSED CM WORR ORDi:R,"�' REPORT � <br />Total Utility Maintenance Manaoement System <br />11/19/1997 Page 1 <br />________________________________________________________________________________ <br />Date Range :O1/09/1989 - 11/18/1997 <br />CM Work Order Range :1001091070001 - UT0200-01-01 Pattern :7101196751i60 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALI� Activ�ty ALL <br />------------------------------------•----_-------------________________________-- <br />CM :•:ORK ORDER ID: 7101�96751260 Title: REPAIft 5721 LOMBARD <br />«DUl'LICAT�: PRINTING Or THIS WORK ORi,�P.•> <br />Item ID: W�0585E096 -- >JATER SERVICE <br />Location ID: -- <br />Program 710 Fu>iction 119 Activity 675 <br />Date Completed: 10/13/1997 <br />Overall Craft: <br />Issued: 10/13/19S7 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL CSG <br />WST iQDT <br />SUP1 WMW <br />Materials: <br />ID <br />ADAP34000447 <br />ADAP34000547 <br />COUP36143547 <br />ELL034101447 <br />ELL034104247 <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name Planned Hrs Actual Hrs Cost <br />------------------------------ ----------- ---------- ---------- <br />CAVANAH, SHANE G. 0.00 6.00 84.78 <br />WALDEN, DAROLD T. 0.00 6.00 127.38 <br />WARL, MICHAEL W. 0.00 1.00 22.56 <br />Description <br />------------------------------ <br />ADAPTER 3/4" IPS UNION INSTA @ <br />ADAPTER 3/4" MIP X INSTA-TITEQ <br />COUPLING 1" CTN X 3;?" MIP @ <br />ELL 3/4"' 90 DEG BRASS " <br />ELL 3/4" 90 DEG STkEE1 BRASS " <br />Total Labor Cost: <br />Date <br />10/13/1997 <br />10/13/1997 <br />10/13/1997 <br />10/13/1997 <br />10/13/1997 <br /># Used <br />1 <br />1 <br />1 <br />1 <br />1 <br />Total Material Cost: <br />Vehiclea: <br />ID Descr�ption Hours Cost <br />------------ ------------------------------ ------ ---------- <br />V2048 89 GMC S15 1.00 5.10 <br />V2117 91 CHEV 1-TON HYD UNIT 6.00 31.80 <br />Total 4ehicle Ccst: 36.90 <br />Total co�t for work order 7101196751260: <br />234.72 <br />Cost <br />9.11 <br />8.38 <br />4.82 <br />1.36 <br />1.51 <br />� <br />25.18 <br />� <br />