Laserfiche WebLink
�✓��:�5��w;:�R�': <br />CLOSED CM WORR ORDERS REPORT TO POSTING �z'"l�l <br />Total Utility Maintenance Management System <br />09/19/1995 Page 1 <br />Date Range :O1/09/1989 - 09/14/1995 <br />CM Work Order Range :1001091070001 - UT2608- - Pattern :7101196648548 <br />Item Range :<Blank> - WW22020001 Pattern :�t <br />Program ALL rur.ct:ion ALL Activity ALL <br />CM WORK �RDER ID: 7101196648548 Title: SO .75 INCH 6010 LOMBARD AVE <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: -- <br />Location ID: <br />Program 710 Function 119 Activity 664 <br />Date Completed: 09/14/1995 <br />Overall Craft: <br />Issued: 07/06/1995 <br />out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />status: <br />Labox•: <br />Craft ID <br />DL IRW <br />UL SSJ <br />WST TDE1 <br />WST WDT <br />UL WMJ <br />Materials: <br />ID <br />AUAP34000447 <br />ADAP34000547 <br />BOX000056247 <br />CORP34001847 <br />CO'JF34003947 <br />ELLG34104247 <br />METE36089447 <br />N/A <br />N/A <br />PIPE34060647 <br />SADD44016847 <br />SETT34033647 <br />Vehicles: <br />ID <br />V2117 <br />VH0003 <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />IRVIN, RYAN WILLIAM <br />SMITH, STEVE J. <br />THOMPSON, DWAYNE E. <br />WALDEN, DAROLD T. <br />WRIGHT, MICHAEL J. <br />Description <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />ADAPTER 3/4" IPS UNION INSTA @ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />CORP STOP 3/4" CCT X INSTA @ <br />COUPLING 3/4" 1/4 BEND COPPER@ <br />ELL 3/4" STREET BRASS � <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />TOP SOIL (FROM STOCK) <br />TOP COARSE (FROM STOCK) <br />PIPE 3/4" POLY I.P.S. <br />SERVICE SADDLE 6" W/3/4" CCT <br />SETTER COP 5/8" X 3/4" (H12") <br />Description <br />91 CHEV 1-TON HYD UNIT <br />94 CAT B7ICKHOE <br />Actual Hrs <br />3.00 <br />7.00 <br />1.O�J <br />7.00 <br />1.00 <br />Total Labor Cost: <br />Date <br />09/14/1995 <br />09/14/1995 <br />09/14/1995 <br />09/14/1995 <br />09/14/1995 <br />09/14/1995 <br />09/14/1995 <br />09/14/1995 <br />09/14/1995 <br />09/14/1995 <br />09/14/1995 <br />09/14/1995 <br /># Used <br />Total Material <br />Hours <br />7.00 <br />7.00 <br />Total Vehicle Cost: <br />�, <br />Cost <br />24.00 <br />105.21 <br />16.56 <br />140.56 <br />15.03 <br />301.36 <br />Cost <br />1 8.29 <br />1 7.80 <br />1 13.05 <br />1 14.87 <br />1 7.92 <br />1 1.75 <br />1 � <br />1 �j����� ' � 36. 00 <br />1 31.4 <br />140 36.40 <br />1 11.46 <br />1 52.28 <br />Cost: � <br />18y. �D <br />Cost <br />39.20 <br />193.20 <br />232.40 <br />