Laserfiche WebLink
Work Activity Work Order <br />ES2�1JpJ�dENT: �'�'ork urder Number 20030131 <br />ID DESCRIPTION Date Units <br />MATEHIAL: <br />ID <br />BRICG0061156 <br />CEME0006143g <br />CEME00061438 <br />COUP44300147 <br />ELL046302647 <br />PIPE46°04347 <br />PIPE46304347 <br />PIPE46304347 <br />PIPE46304347 <br />PIPE46304347 <br />WYE046305147 <br />MISCELLANEOUS: <br />:D — -- <br />DESCRIPTION <br />BRICK, 2-1/4 X 4 X 8 GREY CONC <br />CEMENT 20 MINUTE SET 50 LB. BA <br />CEMENT 20 MINUTE SET 50 LB. BA <br />COUPLING 6 CONCRETE X 6 Cl/P <br />ELBOW 8 BELL X BELL 45 DEG PVC <br />PIPE B PVC SEWER ASTMD•3034 80 <br />PIPE 8 PVC SEWER ASTMD-3034 BO <br />PIPE e PVC SEW�R ASTMD•3034 80 <br />PIPE 8 PVC SEWER ASTMD•3034 80 <br />PIP[ 8 PVC SEWER ASTMD-3034 80 <br />WYE 8 BEL.L X 8 BELL X 8 BELL P <br />DESCRIPTION <br />Sub Total <br />01/17/2003 <br />01/15/2003 <br />01/17/2003 <br />01;13/2003 <br />O7/15/2003 <br />01/10/20D3 <br />O1/13/2003 <br />01/14I20p3 <br />Ot/15/2003 <br />Ot/17/2003 <br />01/14/2003 <br />Units <br />30.00 <br />2.00 <br />3.00 <br />3.00 <br />2.00 <br />39.00 <br />39.00 <br />39.00 <br />39.09 <br />13.00 <br />2.00 <br />Sub Total <br />Date Units <br />Sub Total <br />Page z <br />OS/22/2003 30�45 <br />Cost <br />Cost <br />$6.51 <br />523.67 <br />$35.51 <br />$i5.B6 <br />529.56 <br />$83.89 <br />$83.89 <br />383.89 <br />383.89 <br />527.96 <br />357.87 <br />32.50 <br />C�s <br />So.00 <br />