Laserfiche WebLink
. � <br />�- <br />.: ' <br />. <br />AttaCfgne� C <br />Plans Examiner and In��ector Ch�.;klist <br />PeR►,u r�,�. �(o O I _Address �O�'�7 L.pM� A'2b yD.VE <br />Plens Examiner: Check, write in N/A, or tili in value on shadvJ boxes. <br />Inspector: Check off boxes at left as items are tound to comply. <br />Compilanc� approach: (check ono) ❑ Systems analysis ❑ Coinponent performance L7Prescriptive paih <br />Note: Soma specifics on this form may not apply it � � <br />A) compliance approach is systems analysis or componeni performance; <br />B) compliance to minimum ventilation criteria is demonstrated through ongineering calculaticns or performance tesiing. <br />FOUNDATION PHASE <br />❑ Slab +-!Ft� EMerlor down to frostlfne/slab boitom; or Intedor 2a" horizontal vr vertical; or, If radlan!, under entlre slab � <br />❑ Below grade exterlor wall InauleQon �� (I( Intedor—see Insulallon Phase) <br />❑ Redon mltlgaUon � If Iocaily requlred, or crawlspace venting <1fV300ft2 of crawl, or vents Include an operaWe dampor <br />FRAMING PHASf <br />❑ Freming: ��< Standard �Inlermedlaie u Advanced <br />❑ Std alr seal: solepUsubllr; rlm JsVmud slll; wlndow & door Irms; penetratlon-wlre, plumb, duct, pertitlon studs, Oue, Ilght 1lxlures <br />❑ Source speclfic exheust fens: Slze requlrement—bath, iaundry (5or,fm); kltchen (1o0cfm) <br />❑ Whole houae exhaust fen �� Intermlttent system has manual & auto conlrols; Outdoor alr supply req. lor habltable rms. <br />ar <br />❑ Integrated }orced-elr system � outslde aly duct (wlth damper) allowing behvsen .35 and .5 ACH <br />IHSULATION PHASE <br />❑ � Well Ineulatlori (above grede) <br />❑ � Y�alllneulet�on(beloWgrade):Inlerlorwalllnsulatlon �� <br />� F3�'�.�,� Floor InauleUon <br />❑�, Ceiling Insulation: Including atllc hatch <br />� ��� Vaulted celling Insuletlon <br />❑ Vepor rotarders: wails,lloors, celling <br />❑ Heating system type: <br />�As� BRn. <br />For heatpumps, Iist slze, HSPF, and COP <br />Frrrai. �xase <br />❑ Redon monitor on slte: wllh Instrudlons and general Informatlon <br />❑ Thertnostot: heat ran�:,, 55-75; AC range, 70•85; both, 55-05. Backup heat controls prevent simultaneous operatlon of prlmary sys. <br />❑ Solld fuel appllencos: glass or metal doors; dlred comb. alr source, or 4" dla., dampered, Indlrect source lor uncond, areas <br />❑ Flreplacas: 6" combustlon aIr supply duct w/damper dlrect to tirebox; tight fitting glass or metal doors. <br />❑ DHW henters: NAECA label; separata power or gas shut-off; on R-10 pad if e!aciilc and in uncorxi. area orl( on concrete <br />❑ Mechanlcal ventlletlon ducts Insul�ted to R-4: exhaust duds In uncondltloned areas/supply ducts In condltloned areas <br />❑�__� HVAC ducts/planum InsulaUon: ducts In uncendltloned areas are Insulated and folnls are sealed <br />�� Plpo Insulntlon: R-3 for hot and cold water plping In uncondltloned areas (II servlce or redreulating, see Table 612) <br />❑ oround covor: 6 mll black poiyethylene/approvod uqual lapped 12" at Jolnis and exiending to foundailon wall <br />