Laserfiche WebLink
PUBLIC WORKS PERMIT Date: 11/15/2010 ' <br />Pubiic Works Permit #: PW1011-006 <br />City of Everett Public Works Department wtS � o��� �z,Z <br />��� 3200 Cedar Slreet Buildinq Pe�mit #; -B�G�-1-B��- �� <br />Everett, WA 98201 Planninq Reference #: <br />(425) 257-8810 <br />Public Works Fee $: $ 0.00 <br />Other $: <br />OWNER NAME AND ADDRESS: I APPLICANT NAME AND ADDRESS: <br />LINDNER JOHN <br />5927 LOWELL RD <br />EVERETT WA 98203 <br />PI10NE: 4257505770 <br />AX PARCEL ID # 00495801001301 <br />DESCRIPTION OF PROPOSED WORK: <br />NEW CARPORT WITH DECK <br />�°HONE: <br />SI7E ADDRESS: 5927 LOWELL RD <br />PERMIT CONDITIONS <br />1. All cal!s for inspection shali be made 24 hours in advance. <br />2. Ail work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Cail Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 r-- <br />4. 7he section of the carpoNgarage within the public right-of-way must be removed �the owner's expense if the <br />City ever needs to use the area for Municipal purposes. <br />� <br />� �, ,„<<;�';'Ii`���� �' � >- � <br />� � l�J � <br />DEC 1 4 2010 D <br />crrY or i:v��ai:rr <br />t�«�» �� s��,a«s <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless lhe City of Everelt from any and all claims for <br />damages, cos!s, expenses, or causes of action that may arise <br />because of installation and mainlenance of lhe improvement <br />or other right-of-way use hereto applied for and furlher agrees <br />to remove same upon notice fwm the City and to replace <br />�pu lic property d aged thereby. <br />ti�U 1 �- I � - i v <br />Signalure of App�icant Date <br />NJORK AUTHORIZED BY THIS PERMIT MU5T� BE STARTED WITHIN I80 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENiLY <br />PUf25UED TO COt•iPLETION. THIS PERhiR P1AY BE CANCELLED BY THE C1TY UPON ANY STOPPAGE OF WORK ON TI1I5 PROJECT OVER 90 DAYS DURATION. <br />