Laserfiche WebLink
Larry Crawford <br />From: <br />Ryan Sass <br />Sent: <br />Thursday, March 25, 1999 4:08 PM <br />To: <br />Larry Crawford <br />Subject: <br />Rotary Park <br />Larry, <br />When we built the Rotary Park project a couple of years back, we didn't have the funding to complete all of the protect <br />elements that were within our permit. We are now funded and ready to complete the parking lot paving and drainage <br />that was permitted but not included in the original construction. <br />We have a current and still active Shoreline Permit and our plans for paving and drainage were part of our original permit <br />approved by your staff. What do we need to do to complete our construction? Can the old permit be renewed? Do we <br />even need a permit? Or must we apply for a new public works permit under our existing and still valid shoreline permit? <br />We are going out for bid now for work to be done this summer. Schedule is bid opening April 20th and construction <br />completed in June and July. <br />Thanks. / Ryan <br />.4 -6 ,? 2 <br />.6& /au 1/za <br />tF�av-:.c� c%/L1�u✓c..�sJ o� -2/•• 9S� . �2.-w �' r� .l��c. <br />�� � fu,.,., � die-e�e� uoti'!y0 62c�r/a.// P.lm..o• . <br />