Laserfiche WebLink
,� � DAMES & MOORE <br />1750 S. W. HARBOR 1VAY, SUI i G 400, PORTLAND, OREGON 97201 <br />� (503) 228-7688 PnX: (503) 223-6083 <br />rm <br />Mr. Phil Tollefsoa <br />� ' 7acobs-Sirrine �ngineers, Inc. <br />' SOO�J Meadow Lane, Suite 400 <br />. <br />Lake Oswege, OR 97035 <br />� ,< <br />Dezr Mr. Tollefson: <br />January 19, 1995 <br />Geotechnical Investigation <br />Converting Plant Addition <br />Scott Psper Company Plant <br />Everett. Washington <br />�. Transmitted herein is our report entitled "Geotechnical Investiga6on, Converting Plant Addition, <br />� Scott Paper Company P(ant, Everett, Washington." The scope of our services is outlined in our <br />proposal dated December 14, 1994. During the course of the investigation, we have provided <br />• our £mdings and design reconunendat;ons verbally to Mr. Troy Smith as requested. Those <br />, recommendatior,s, along with supporting data, aze documented in this report. <br />� We appreciate the opportuniry of conducting this investigation and look forward to otr continued <br />,- involvement during construction. If you have any questions or mquire further assistance, please <br />call. <br />�a <br />(i <br />I1 <br />i� <br />�.: <br />j �, <br />I <br />11 <br />� <br />� <br />Enclosure <br />I` <br />i-. <br />� <br />I= <br />503289-01.0 l /JPM: JNG:I ih/03289-044-016 <br />Very Tculy Yours, <br />DAMES & h100RE, INC. <br />�� <br />John P. Ma ' , P.E. <br />Associate <br />/�/. /�� <br />Jonathan N. Guido, P.E. <br />Staff Engineer <br />1 � oiric�' �eow u�rinG <br />'F.� <br />�_� <br />,� <br />;=;: � <br />=; 1'• <br />��:•.r <br />