Laserfiche WebLink
eve! INSPECTION REPORT <br />(J'um..j <br />Address -7C)DG to -�• <br />Contractor <br />Owner _ kj iVon on'r.^ <br />Date <br />TYPE OF INSPECTION REQUESTED <br />XBLDG: Pmt. No. -2v�❑ MECH: Pmt. No. <br />59ELEC: PmI. No. <br />❑ PLBG: <br />Pint. No. <br />❑ Temp. Elect. <br />Footing <br />❑ Framing <br />_ <br />❑Gas Piping <br />'❑ Foundation <br />❑Drywall, Nailing <br />❑ Shear Nailin <br />O Consultation <br />❑ Ductwork <br />❑ Grid 9 <br />Groundwork <br />❑ Wood Stove <br />❑ Mason <br />❑ Rough -In <br />9 <br />Struct. Slab <br />❑ Final <br />❑ Service <br />El <br />;APPROVAL ct5 rL v cp ❑ PARTIAL APPROVAL <br />VIOLATION D CORRECTION REQUIRED <br />1.1 Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />• CALL 259-8810 FOR REINSPECTION — 24 hcur notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOg CCUPANCY. <br />(QC�sv:flr «--. irr <br />Inspector" / ,_ ) 6n C %) Date 617-6 <br />