Laserfiche WebLink
3 <br />CLOSED CM �lORK ORDERS REPORT <br />Total Utility Maintenance Management 5ystem <br />04/16/1998 Page 1 <br />________________________________________________________________________________ <br />Date Range :Ol/09/1989 - 04/O1/1998 <br />CM Work O�der Range :0810800810001 - UT2830-30-322Pattern :7101195751410 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />----'--•---------•------------------------------------------------------------------ <br />CM WOR?( pRDER ID: 710�196751410 Title: REPAIR 7524 LOWER RIllGE RD <br />c<DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS1284J011 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 03/31/1998 <br />Overall Craft: <br />Issued: 03/30/1998 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hosrs <br />Status: <br />T,a�or : <br />Craft ID <br />WST TDE1 <br />SUP1 WMW <br />Materiala: <br />SD <br />ADAP34000547 <br />ADAP3�000647 <br />BOX000056247 <br />COUP34142747 <br />ELL032135847 <br />SETT34149747 <br />Vc+hicles: <br />ID <br />------- <br />V2048 <br />VJ0026 <br />I3sued I�y: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name Planned. Hrs Actual Hrs <br />------------------------------ ----------- ---------- <br />THOMPSON, DWAYNE E. 0.00 8.00 <br />WARD, MICHAEL W. 0.00 2.00 <br />Description <br />------------------------------ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAPTER 3/4" FIP X INSTA-TITEC� <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" CTS COMP X MIPTO <br />ELL 3/8" 90 STREET BRASS � <br />SETTER COP 5/S" X 3/4" (H7") <br />Description <br />------------------------------ <br />89 GMC S15 <br />'97 FORD 1 TON SVC TRUCK <br />Total Labor Cost: <br />Date # Used <br />-------- -------- <br />03/31/1998 1 <br />03/31/1998 1 <br />03/31/1598 1 <br />03/31/i998 1 <br />03/31/1998 1 <br />03/31/1998 1 <br />Total Material Cost <br />Hours <br />3.00 <br />8.00 <br />Cost <br />12.60 <br />47.20 <br />---------- <br />Total Vehicle Cost: 59.80 <br />Cost <br />164.96 <br />46.32 <br />211 28 <br />Cost �, <br />8.42 <br />7.73 <br />12.94 <br />4.11 <br />3.48 <br />38.66 <br />�I.7�L! <br />Work Lescription: <br />-------------------------------------------------------------------------------- <br />TOP OF METER VALVE APPEARS TO BE CRACKED PER TOM NEWELL. <br />Total cost for work_ order 7101196751410: 346.42 <br />