Laserfiche WebLink
everett <br />� <br />INSPECTlON REPORT <br />7'� � 3 C?> <br />Address �u �..�uiz�" ���o'e �"Q <br />i <br />Contractor L. �n a � �'��, <br />`( _T. <br />Owner <br />Date _3 �7 � �`�l <br />TYPE OF INSPECTION REQUESTED <br />�BLDG: Pmt. No. Z�O�a � MECH: Pmt. No. <br />❑ ELEC: Pmt. No. ❑ PLBG: Pml. No. <br />❑ Temp. Elect. ❑ Framing ❑ Gas Piping <br />,�QFooting ❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Struct. Slab <br />❑ Wood Slove ❑ Rouc�h-In ❑ Final <br />❑ Masonry ❑ Service ❑ <br />❑ APPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION �CORRECTION REQUIRED <br />G Corrections listed below MUST BE MADF before work can be approved. <br />❑ Please coMact inspector and arrange (or appointment. <br />❑ Was not able to perform inspection. <br />��d�L�L 259•8810 FOR REINSPECTION — 24 hour notice required. <br />A CERiiFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector ��% �� � �� K�A , Date '-�-_7-F � <br />