Mr. Chris Lark <br />February 20, 2001 <br />footing drains consisting of 4-inch diameter perforated pipes encased in pea gravel should be <br />installed adjacent to thc base of the footings. RooPdown spouts should not be tied to the footing <br />drains. All drainage should be directed into conduiu which carry runoff away from the building <br />and paved areas into storm drain systems or other appropriate outlets. <br />7.0 ADDITIONAL SERVICES <br />� The recommendations presented in this repoR are based on the assmnplion that an adequate <br />program of tests and observations will Ue made during conslruction to verify compliance with <br />�these recommendations. Modifications to our recommendations presented in this report may be <br />� necessary, based on the actual conditions encousrtered during construction. We recommend that <br />PanGEO be retained to oversee or to provide canstruction support seivices. These serviccs <br />� <br />�, <br />should include, but not necessarily be limited to, the following: <br />• Observation of subgrade preparation <br />• Observation of subo ade materials at footing locations <br />• Observation of fill placement <br />• Observation of temporary excavation and rockery wall construction <br />• Preparation of a final inspection report summarizing the results of our firld monitoring <br />8.0 LIMITATIONS <br />Recommendations contained in this report are based on a site rcconnaissance, a subsurface <br />exploration program, review of pertinent subsurface infarmation, and our understanding of Uie <br />�-� project. The study was performed using a mutually agreed-upon scope of work. <br />Variations in soil conditions may exist between the locations of the explorations and the actual <br />conditions underlying the site. The nature and extent of soil variations may not be evident until <br />construction occurs. If any soil conditions are encountered at the site ihat are different from <br />tUose described in this report, we should be immediately notified to review the applicability of <br />our recommendations. Additionally, we sliould alsu be notified to review the applicability of our <br />recommendations iftl�ere are any changes in tUe project scope. <br />The scope of our work does not include services related to construction safety precautions and <br />our recommendations are not intended to direct the contractor's methods, sequences or <br />procedures, except as specifically described in our report for consideration in design. <br />Addition�lly, the scope of our work specifically excludes lhe assessment of environmcntal <br />characteristics, particularly those involving I�azardous substances. <br />This report may be used only by lhe client and for the purposes stated, within a reasonable timc <br />� from its is�uance. Land use, site conditions (both off and on-site), or other factors including <br />advances in our understanding of applied science, may change over time and could materially <br />t affect our findings. Therefore, lhis report should not be relied upon aRer 24 months &om its <br />I , r1�;�_�I <br />00-046-100 Geotech Report g PanGE0,1nc. <br />� <br />�, <br />