My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1809 MADISON ST 2016-01-01 MF Import
>
Address Records
>
MADISON ST
>
1809
>
1809 MADISON ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 6:53:26 PM
Creation date
2/17/2017 9:59:10 PM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
1809
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plarch 24, 1989 <br />Valley Natural Gas <br />2605 MCGougal <br />Everett, WA 98201 <br />CITV GF <br />everett <br />Job Address: 1809 :dadison <br />PUBLIC 1YORKS OEPARTMENT <br />Permit Number(s) : Z0900 �200CEDRRSTqEET <br />EVERETT,N'ASHING JN <br />Date af Permit(s): 9-26-88 esxoi <br />A review of our inspection records reveale that the last inspection made at <br />the subject addzess was on 9-Z�-88• <br />Section 3G3(b) of the Uniform fluilding Code provides that permits expire by <br />limit-ation and become null and void if the Uuilding or work authorized by <br />permit is suspended, after the work is convnenced, fur a period of 100 days. <br />The Code also requires final inspection prior to occupancy for all permits <br />issueu, and it is the responsibility of the permit holder to call for the <br />necessary inspections. Hecause of these time irames, your permit has already <br />expired. <br />However, the City of Everett is at this time extending a one-time grace <br />period to holders of recently e:cpired permit�. If you wish to recommence <br />work you may renew your permit at no cost for an additiunzl 180 day period <br />by submitting a written request to this of£ice. The renewal request must <br />reach us by April 30 1989. Sf the work has been completed, you may call for <br />final instection before April 30th. Any corrections required must be <br />completed �nd final approval obtained before that date. Permits that have <br />been neither £inaled nor extended by April 30 1�89 will expire. To renew <br />the work or obtain an inspection will then require the payment of a fee. <br />You may mail or deliver written requests to our office at 3200 Cedar Street, <br />Everett, WA 98201. If you hav� questions or want to request an inspection, <br />please call us at 259-6810, 8:00 AM to 5:00 PDf, Monday through Priciay. <br />Sincerely, <br />ALFRED R. THEAL, P.E. <br />Public Works Director � <br />By: Margaret McLeod <br />Huilding Depar��ment <br />STPEETS REALPHCPEPiYI TRANSIT MOTOR BUILOIN6 PUBLIC UTILITIES CONSTFUCTiON ENGMEERMG TRAFFICENGP/ <br />259�BB20 �I.D's 259�B909 VEHICLES 258�8800 SERVICES 2_'9�BB00 INSPEGTION 059�BB00 SiGNAL MNNTENANCE <br />]59�6800 238�BB02 i59�9900 ':/ater5ewe� Z59�BB0� 359�BB00 <br />Oramage <br />
The URL can be used to link to this page
Your browser does not support the video tag.