Laserfiche WebLink
J� ' <br />-.,�;ur�e.�:=,^>.�:�.rac^�,�,-..;•m�*.-,.... . �-.-.. .._::�. � . . -. .,._ . .. <br />October 12, 1979 <br />= � L 1�. �/. 7 i U G F! C� (C ST'/�TU S E <br />� <br />n$ 3�"' • U/G f�O�.+Gri ITCSo� GN� e" <br />Snohomish County P.U.D. <br />P. O. 9ox 11Ui <br />Everett, WA 98206 <br />ATTN: Mr. R. 1.. Neubauer <br />Subject: P.U.n. Permit 4179-19 <br />W.n. >/$78 <br />Dear Mr. Neubauer: <br />I f V `^�'y27 <br />the Evergreen <br />cirv oF <br />everett <br />GITY ����� � i50•e'I!3 <br />CV[ll[TT. Wr16MINGTOM <br />�e:ot <br />Your application for a perm k to install a portion �f underground power system <br />within the public right-of-w�y at 2527 Madison has�been approved on October <br />12, !9?? as per �lan �N.O. �l993701). _� <br />The subject permit approval is based on the agreement that all work will be <br />carried out in accordance with the City of Everett standards and American <br />Fublic Works Association specifications for irench excavation and backfilling <br />(Reference: Section 61, par. 3.05 and 3.06). All hard surface street crossings <br />shall be by jacking, boring or other preapproved construction methods. <br />it will be the obligation of the utility company to bear any costs that may be <br />incurred in tes:ing and confirming the requirements. <br />TY�e restoration of ail landscaping and repairs will be comparable with its original <br />condition and to the satisfaction of the City Engineer or his appointed representative. <br />it will be your responsibility to contact the City Engineering Department (phone <br />259-881!) immediately prior to starting construction� <br />Sincerely, <br />HUGH WARREN, P.E. <br />Airector of Public Norks <br />�,G���LG1Jt� <br />U <br />By: 7efi Kerwin <br />Utility Inspector <br />H�N:7K:jc1 <br />t <br />;4 <br />'i <br />n <br />