My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2530 MADISON ST 2016-01-01 MF Import
>
Address Records
>
MADISON ST
>
2530
>
2530 MADISON ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 12:16:15 PM
Creation date
2/17/2017 10:20:31 PM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
2530
Notes
HEARING EXAMINER'S REPORT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. <br />� <br />L� AGRA Earth & Environmental <br />ENGINEERING G1084L SOWilONS <br />3 October 1997 <br />7-91 M-11905-0 <br />AirTouch Cellular Corporate Construction Dept. M/S 223 <br />3350 161'� Avenue SE <br />P.O. Rox 91211 <br />Bellevue, Washington 98008 <br />Attent�ian: Mr. Chris Miller <br />Corporate Construction Specialist <br />SubjecY: Geotechnical Engineering Repart <br />AirTouch - SEA-PRTGARD Alt. No. 2 Cellular Sita <br />2520 hladison Street <br />Everett, Washington <br />Dear Chris: <br />AGRA Earth 6 <br />Environmental, {nc. <br />11335 NE 122nd Way <br />Suite 100 <br />Kirklend, Washington <br />USA 9BD34-6918 <br />Tel (206) 820-4669 <br />Fax (206)827-3914 <br />AGRA Earth & Environmental, Inc. (AEE) is pleased to suhmit this report providing the <br />results of our recent geotechnical engineering evafuation conducted for the abova- <br />referenced project. The purpose of our evaluation was to derive conclusions and <br />recommendations concerning site preparation, tower and eyuipment shelter foundations, <br />structural fill, and other considerations. <br />The scope of work completed for this study was consistent with the evaluation <br />�_ requirements provided to us by AirTouch Cellular and included a site reconnaissance, a <br />limited field exploration, limited laboratory testing, geotechnical research, geotechnical <br />� engineering analyses, and preparation of this report. We received authorization to proceed <br />with our evaluation on 24 September 1997. This raport has been prepared for the <br />exclusive use of AirTouch Cellular and their consultants, for specific application to this <br />{ project, in accordance with generally accepted geotechnical enginzering practice. We <br />� appreciate the opportunity to be of service on this project and would be happy to answer <br />, any questions you may have. <br />Respectfully submitted, <br />AGRA Earth & Environmental, Inc. <br />John yl. Zeman <br />Sen r Staff Engi <br />'l�B1M�11006-0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.