My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2530 MADISON ST 2016-01-01 MF Import
>
Address Records
>
MADISON ST
>
2530
>
2530 MADISON ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 12:16:15 PM
Creation date
2/17/2017 10:20:31 PM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
2530
Notes
HEARING EXAMINER'S REPORT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
425-621-3914 AGRR EARTH 8 ENV. 867 P02 <br />� AC�RA <br />FNGiNEERING GLOUI SOlVT10N5 <br />June 7, 1999 <br />9-91 M-12880-0 <br />Strata Communications <br />3501 Everett Avenue <br />Everett, Washington 98201 <br />Attention: Mr. Mike Gordon <br />SubJect: Final Summary of Special Inspections <br />Air Touch Poft Gardner <br />Ma ison ree <br />verett, WA <br />Building Permit . B615f17 <br />Dear Mr. Gordon: <br />JUN 06'99 08:15 <br />AORA Evlh t <br />Emira�l, Inc. <br />11J75 NE 171nd YVay <br />''u� f00 <br />qrldaiM. WadW�Obn <br />uan aewsa�te <br />Tei p261 MlOd9BY <br />Fu (t?L)s21Jo14 <br />AGRA Earth & Envfronmental, Inc. (AGRA) respectfully submits this final summary of special <br />inspection services for the referenced project. Our services were perfurmed as requested and <br />scheduled by Strata Communications. Daily reports of our inspection were prepared at the tfine <br />our services were provided. Ourdally field reports, which are attached, form the basis (or this final <br />summary letter. <br />AGRA performed special inspection services for reinforced concrete for the drilled pier tower <br />footing. We observed that the reinforcing steel and placement of concrete conf�rmed with the <br />approved plans and specifications. All concrete samples collectc::� during construction met or <br />exceeded the specified 28-day compressive strength requirements. <br />Performed inspection services for anchor bolts tightening. All anchor bolts were found to conform <br />with approved plans and specifications. <br />� 5\WOROPROC�99Pm)ecIflSMllk\12000�U2BPO�ParlGeronlcnp! <br />
The URL can be used to link to this page
Your browser does not support the video tag.