My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
407 MADISON ST 2018-01-02 MF Import
>
Address Records
>
MADISON ST
>
407
>
407 MADISON ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 1:02:14 PM
Creation date
2/17/2017 10:24:24 PM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
407
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BL//LDlN <br />�cneR 5T. �YE/zE77, N��! 9920J (206) 259 gBlO <br />Nance method allows any combination of building e;;velope <br />The Chapter 5 A roach This comp' <br />�f the Chapter 6 pathways. This is <br />?< components i their collective heatloss (R and U-values) doesn't exceed a maximum WSEC budget. The <br />Chapter 5 approach is a good choice for additions that don't conform to any <br />true because Chapters allows Component Performance calculations to include heat loss improvements in the <br />ent than Chapter 5. <br />existing home. The Chapter 6, Presciptive Approach would normally d i the lust choice for new dwellings since <br />erfdrmed by computer using programs such as WATTSUN <br />it provides a variety of cor.:pliance options, is easier to use, and is no more string <br />Component Performance calculations may also be p <br />lnstr'tctions: Provide instructions and forms for performing the Component Performance <br />Page 1, 2, 3 The first two pages eP s stem. <br />calculations. The third page sizes the heating Y <br />components ea equipment that don't apply to Your project. Your permit will be processed <br />Pages 4 to S In the shaded areas, make checks in the circles next to the roquirements ofyour „ general <br />design. Disregard comp Department staff can help y <br />more efficiently if you provide all the requested information. <br />s. questions about this form. inspectors and building <br />This form is intended to educate and provide enforcement consistency betwer ag insulation, and final <br />jurisdictions. Instead fo searching <br />t Regghenhenare WSEC, this <br />form will help <br />foundation, rganing and condense the <br />requirements that apply Y project- <br />Y inspection phases. <br />provide detailed information about heating <br />ecilications. Be sure to get prior approval from the <br />'31 Responsibility for information: It is ultimately your responsibility to p <br />systems, glazing, insulation, and other building sp <br />Department if you make changes that deviate from the completed form. For more code detail, refer tot e <br />Washington State Energy Code, 1991 Edition. <br />blllty: This form will ultimately be used for all WSEC field inspections. When it is returned column. <br />with your permit, note all boxes that have been checked under the "COMPLIANCE REQUIRED" <br />Compliance responsiThese <br />lacing a second chech. <br />and <br />boxes den oh ofh4ese checked items by pspe g r will check at each inspection phase. He will inspect <br />k in the "INSPECTION APPROVED" column <br />approve each <br />All Residential Occupancies <br />OTHER heat source(Gas, oil, propane, wood, heat pumps) <br />WEES,SoWRMWOCTOBER9i <br />
The URL can be used to link to this page
Your browser does not support the video tag.