Laserfiche WebLink
x <br />i <br />COMPLIANCE�. <br />REQUIRED n aY'a�3,,.��`,:. > a •.-;. . .g: ; <br />INSPECTION <br />APPROVED / IMPORTANT: Please supply Information In the shaded boxes and check the appropriate <br />Cd circles. Disregard topics that don't describe your building or equipment. DO NOT place <br />checks In the two left columns. <br />❑ ❑ Q Walls; inciudine, rim joists, Shail be insulated without compression to R (Calculations): <br />F. <br />❑ ❑ ©a Interlor below grade walls shall be insulated to R (Calculations) <br />❑ ❑ ©s Exterior stab insulation, it not located en the inferior, shalt be R (Calculations). <br />❑ ❑ �aulled. ceilings shall be insulated without compression to R (Calculations) <br />❑ ❑ 2 Skylight wail Insulation is installed and equivalent to the required wall R-values above. <br />❑ ❑ ® Vapor retarders shall be installed toward the warm surface as represented`betow (502.1.6): <br />Select one option for floors, walls, and appropriate ceilings <br />Floors. V Plywood W/ exterior glue a Poly (a 4 MI) 0 backed batts <br />Wails: U Poly plastic (a 4 Mil); O Pace-staplee backed baits 7cU PVA paint <br />Ceilings: O Not required where ventilation space averages >12" above insulation. <br />O Face stapled backed balls 0_Pol-y plastic (a 4 mil) PVA paint <br />❑ ❑ z9 Heating system efilclency and sizing requirements shalt be met as represented below: <br />❑ ❑ 0o xlmum heating system output (150% of design heat 102d) is :�tG C> KV! OS. 503.2.2) <br />BTU/H Q <br />Heatingsystem requirements trw ill be met with f I oino system 'S <br />❑ ❑ OMfr._1Qb/ V q Model G r FretE lGiax. outpuUr <br />Type —,Go r4 G <br />WSEC Insulation phase requirements: <br />Inspected by: Date _— <br />❑ 2 crawl space Floors shall be Insulated without compression, and with supports 24" O.C. to: R- Ly <br />❑ ❑ Non -vaulted, attic callings shall be insulated withoul compression to: R � <br />See Calculations ; <br />❑ ❑ 0 Door syst0ms shalt meet: U- . <br />Doortypesaro(1)!�—`—(3)— <br />