My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
515 MADISON ST 2016-01-01 MF Import
>
Address Records
>
MADISON ST
>
515
>
515 MADISON ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 5:30:22 PM
Creation date
2/17/2017 10:29:33 PM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
515
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLIANCE NWEC LOWRISE RESID�NTIAL �OIVIPLIANCE CHEGKLIST <br />HE�UIpED� Electrlcally heated dwellings, s 3 storles, Zone 1, Wostern Washington <br />INSPec7�oN �MPORTANT: Please supply Informatlon requested Ir� the approprlate <br />APPROVED <br />shaded 5oxes below. Dlaregard boxes that don't des�rlbe your bullding or <br />equlpment.II4�J.Q.tPlace checks In the two left columns. <br />INSULATION PHASE <br />Wells(including rim Joists) wlll be Insulated without compression to: �q <br />❑ R-19 batt (Ch#6, options I,III,IV) ❑ R-24 (Ch #6,Option II) � R-11 _(Gh # 4 or 5) <br />Below g rade walis not insulated on the exterior (See FOUNDATION PliASE) wfll be insulated to: <br />❑ R-13(Chapter 6, all Options) on the interior ❑ R-_ (Chapters 4, 5, or 7) on the interior. <br />Vaulted celllnps will be (nsulated without compressbn to: <br />❑ R38(Ch #6, all optionsj ❑ R_(Ch #4 or 5) <br />pht well Insulatlon is installed and equfvalent to the required vvall R-values <br />(Recommendation: place cefling insulation bat2s in place behind skyifght wells) <br />Vapor reterders will be inslalled toward the warm suAace as represented below: <br />Select one o tion (or floors, walls, and approprfate ceilings: <br />Floors: � Plywood labeled EXPOSURE 1❑ Poly (24 Mil) ❑ backed batts PVA <br />Walis: ❑ Poly plastic (a 4 Mil) ❑ backed batts ❑ PVA <br />Ceflings: ❑ Not reGuired where ventilation space averages >12" above insulati <br />Op� �� � 4 � ❑ backad �atts �PVA <br />,,, <br />�-- � <br />Heatinp system etflcienc�� a�d slzinp requirements will be met as represented b�elow:c� O <br />Maxlmum heating system capaciiy (150%of design heat load) has been calculaied at_L—KW <br />Heat Pump efflc!ency will be met underthe following compliance path: <br />❑ Ch #6, Option IV: air source heat pump: HSPF a 6.8 <br />❑ Ch #5 air source heat pump: HSPF a 6.8, COP a 2.7/2.0 <br />❑ Ch #5 water source heat pump; COPa 3.0 <br />Heating system requlrements wlll Is met wlth tollowlnp system: <br />Mfr. Model # Maz. outpu� KH► <br />Type HSPF COP <br />NVVEC Insulation p� a� requlrements: <br />Approved by• ��/1 ��-�-�'� <br />Date <br />WEE9APNIL00 Page 6 ot 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.