Laserfiche WebLink
. � <br />CLOSED CM WORIC ORDERS REPORT <br />City cf Everett Total Utility Maintenance Manayement System <br />02/OB/1994 paye 1 <br />Date Range 11/09/1900 - O1/3t/1994 6 z======6====�_=====s==========c====� <br />CM Work Ordet Range :0610800810001 - 8405423060229Pattern :740119G750753 <br />Item Fange :<Blank> - WW2202o0�1 Pattern :� <br />Program ALL Function ALL Activity ALL <br />________:___ __�__�___________�__________________________________________�_______ <br />CM WORK ORD�R ID: 7401196750753 Title: CONVERT 720 MADISON ST <br />Item ID: WS0785C004 -- WATER tERVICE <br />Location ID: -- <br />Prog=�m 740 Function 119 A�tivity 675 <br />Uate Completed: O1/28/1994 <br />overall Craft: <br />T_ssued: O1/26/1994 Issued by: SKi Assigned to: <br />Out of Service? NO Priority: Travel Time: O.OU Hr. <br />Meter Reading: <br />Downtime: o houz�s <br />Status: <br />Labor: <br />Craft ID Name Planned Hrs Actual Hrs <br />____' ______ _____________"________________ ___________ __'_______ <br />UL LMA LIBBZNG� MAURICE A. 0.00 ..00 <br />WST WDT WALDEN� DAROLD T. 0.00 4.00 <br />Materials: <br />ID Description <br />__________'_"___" <br />ADAP3400034? ADP.PTER 3/4" CST X INSTA-TITE@ <br />ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX000065547 BOX METEF CONC W/STEEL LID <br />COUP34004647 COUPLING 3/4" ANG MET X FIP @ <br />COUP34142747 COUPLI4G 3/4" CTS COMP Y. MZPT@ <br />METE36089447 METER 5/8" + NO REMOTE READER <br />PIYE3406G647 PIPE 3/4" POLY I.P.S. <br />VALV34008348 VA:,VE METER 3/4" LOCIC WING IP@ <br />Vehicles: <br />ID Description <br />V2146 SVC TRUCK CREV 87 <br />work Description: <br />METERn 11240 <br />Total cost for work ordet 7401196750753: <br />Tot31 Labor Cost: <br />Date <br />O1/28/1994 <br />O1/28/1994 <br />O1/28/1994 <br />O1/28/1994 <br />O1/28/1994 <br />O1/28/1994 <br />O1/28/1994 <br />O1/28/1994 <br />n Used <br />_'_____i <br />3 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />Cost <br />52.08 <br />73.28 <br />125 36 <br />Cost <br />6.03 <br />24.18 <br />33.�7 <br />3.31 <br />5.20 <br />29.60 <br />0.52 <br />8.01 <br />Total Material Cost: 112.22 <br />Date Hours Cost <br />___'_'__ __"__ '__""_" <br />O1/28/1994 4.00 20.80 <br />__________ <br />Total Vehicle Cost: 20.80 <br />--------------------------------- <br />258 3D <br />