Laserfiche WebLink
. �. c � � <br />a CLOSSD CM WORR ORDSRS REPORT TJ POSTIN6 FEB i 4 ZOOE <br />Total Utility Maintenance Management Syetem <br />01/OS/1998 Page 1 <br />______________'_�________________________-_-------------------_______________�__ <br />- ------------------- <br />Date Range :O1/09/1989 - O1/O1/1998 <br />CM Work Order R.ange :0810800810000 - UT28:i0-30-322Pattern :7101196649332 <br />Item Range :<i3lank> - WVL3694L05 Pattern :* <br />Prcgram .ALL Function ALL Activity AI,L <br />--------------------------------_--- -----------•-------------------------------- <br />CM WORK ORDER ID: 7101196649332. Title: SO 1 INCH 1231 D7ADR�:JA AVE <br />«DUPLICATE P:�INTING OF THZS WORK OT±DER» <br />Item ID: -- <br />Location ID: -- <br />Program 710 Func*ion li9 Activity G64 <br />Date Completed: 12/18/1997 <br />Overall Craft: <br />Issued: 04/23/1997 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Lebor: <br />Craft ID <br />EO CCL <br />WST TDEl <br />SUPl [9MW <br />UL WTE <br />Materials: <br />ID <br />ADAP36001247 <br />ADAP36001247 <br />BOX000065547 <br />CORP36002247 <br />COUP36006547 <br />METE36089247 <br />N/A <br />PIPE360607�7 <br />SADD44017047 <br />SETT3Gu3?547 <br />Vehic:�.es : <br />ID <br />VH0003 <br />VJ0026 <br />Issued by: Assigzt�d to: <br />Prioritv: Travel Time: 0.00 Hr. <br />Name Planned Hra Actual Hrs Coat <br />--- ---- ----------------- --- -- -- -- ---- -- - --- --- <br />CRAIG, CHESTER L. 0.00 8.00 157.76 <br />THOMPSON, DWAYNE E. 0.00 13.50 258.53 <br />WARD, MICHAEL W. 0.00 1.00 22.56 <br />WESTVANG, TERRY E. J.00 13.50 213.03 <br />Description <br />ADAPTER 1" MIP X INSTA-TITE Q <br />ADAPTER 1" MSP X TNSTA-TITE Q <br />BOX METER CONC W/STEEL LID <br />CORP STOP 1" CCT X INSTA-TITE� <br />COUPLING 1" 1/4 BEND COPPER Q <br />MEiER 1" NEPTUNE T-10 <br />TRACING WIRE <br />PIPE 1" POLY I.P.S. <br />SERVICE SADDLE 6" W/1" CCT <br />SETTER COP 1" (H15") <br />Description <br />94 CAT BACKHOE <br />'97 FORD 1 TON SVC TRUCK <br />Total Labor Coat: <br />Date <br />12/17/1997 <br />12/17/1997 <br />12/17/1997 <br />12/17/1997 <br />12/17/1997 <br />12/17/1997 <br />12/17/1997 <br />1'l/17/1997 <br />12/17/1997 <br />12/17/1997 <br /># Used <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />16 <br />14 <br />1 <br />1 <br />Total Material Cost: <br />Hours Cost <br />8.00 193.60 <br />12.00 70.80 <br />Total Vehicle Cost: 264.40 <br />651.88 <br />Coat <br />11.95 <br />23.90 <br />44.94 <br />26.31 <br />9.85 <br />93.56 <br />1.76 <br />4.62 <br />11.70 <br />96.05 <br />32�'. 64 <br />3�.�� <br />7�f <br />