My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1303 MADRONA AVE 2016-01-01 MF Import
>
Address Records
>
MADRONA AVE
>
1303
>
1303 MADRONA AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 11:10:57 PM
Creation date
2/17/2017 10:44:45 PM
Metadata
Fields
Template:
Address Document
Street Name
MADRONA AVE
Street Number
1303
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. <br />�5'- <br />� <br />8. <br />PUBLIC WORKS PERMIT COMMENTS <br />Connect side sewer per City Standard �601. <br />Connect side sewer per City Slandard #'s 601, 602, 604. <br />Connect all rooftop downspouts to the side sewer. <br />Connect rooflop downspouts to lhe drainage system provided for this lot. <br />Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everelt Storm <br />Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See altachment for <br />more details. <br />% 9. 1 The contrar,lor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br />��% beg�nning the project. <br />�__. <br />`10. Install erosion control measures as determined by the Public Works inspector, such as silt (ence, straw <br />bales, swales, or erosion b!ankets. <br />C� 4- '` <br />�15. ���� <br />Install erosion control measures per City of Everetl Standards for small parcels <br />Remove erosion conlrol measures upon completion of the project prior lo final approval of the permit. <br />All excavaled material from foundation, �idewalk and driveways shall be hauled to an approved, <br />permilted site. No wasling of malerial is allowed on this building lot. <br />No dirt, mud, rocks or debris to be tracke� onto roadway. <br />No building materials to be stack.ed on sidewalks .:nd sidewalks to be kept clean and open for <br />pedestrian travel. <br />Adjusl waler meter box 1" above sidewalk grade. <br />Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A & 306 on <br />lhis proposal's irontage as directed by the Public Works Inspector (i.e. all unused driveways and ar.y <br />broken or damaged area must be replaced). <br />Install a Type I concrete driveway per City of Everetl Standard #307. <br />Pave driveway from the front property line out to the street paving. <br />:<0. Contact the _ <br />sewer services. <br />Waler Distrir,t for connecting provisions for this building's wafer and <br />A catch basin as per City Standard Plan #402 wilh a gas trap per Standard Plan #410 is required for the <br />parking area. <br />If a sewer pump system is to be inscalled, lhe pressure line must discharge inio a private manhole, then <br />gravity ilow across the public right-of-way. <br />A sprinkler system is required for this building in compliarice witn lhe requirements of NFDA Standards <br />13D. <br />�OR PUBLIC WORKS INSPECTION, CALL RANDY AT 425339-7403/ CLIFF AT 425-339-7404 <br />p�,:ezn:n,��ats <br />
The URL can be used to link to this page
Your browser does not support the video tag.