Laserfiche WebLink
Geotechnicnl �ngineering Evalu2tion <br />1303 Madrona Ave - King <br />December 2, 2006 <br />RMI Fila No. 39306 <br />Page 7 <br />Sttvcturnl Fill <br />Gcoernl: A.11 fill placed beneath buildings, paveinents or o:her seulement-sensitivc fcatures should bc <br />placed as structural fill. Por thc purpuse of this report, sin�cturul fill is defined as mnrerial �hat is placed <br />in accordnnce wiili prescribed methods and standards, and is monitored by an expericnccd geotechnical <br />profnssienal or soils technician. Pield monitoring procedures would includc the performance of 1 <br />representative number of in-pluce densiry tests to document die attainment of the desired degree of <br />reiative compaction. The nreas to receive fill �hould be prepared as oudined in Uie Site I'reparatiort nnd <br />Grading subscclion of this repod. <br />Matcrials: Importcd structurnl (ill shnuld consist of a good quality, froc-draining granutnr soil, frcc of <br />organics nt�d othcr dcictcrious mntcrial, nnd bc �ti�cll grndcd to s:naximum sizc of about 3 mches. <br />Importcd, nll-weatlicr fll shoulJ mcct thcsc requiremenls, und also should contain ro more tL=n obout i <br />perccnt fines (soil passing a U.S. No. 200 Sieve), based on that Gaction passing Uic U.S. 3/4-inch sicve. <br />'I'Lc on-sitc nativc soils predominandy comprisc mcdium sand widi so�ue silt. It may be feasible to use <br />ihis mnterial as stnwtural fill, if it is rc!ntivcly free of organics and can bc moistu��e-conditioned to nenr- <br />optimum moisture content for compnction. The necessary moisturo-conditioning may consist of drying <br />tlic material, whicli �vould require an ndequate nren to spreud the mnterial uul. Drying ihc malerial nmy <br />not bc possible outsidc oF thc summer season. <br />Pill Placement: Pollowing subsradc preparation, placemeut uf tlie stnicturul fill mtiy procecd. All fill <br />should bc placed in G- to 8-inch Aiick uniform lifis, and cach lili shoulel be spread evenly and be <br />t6oroughly compncted pri�r to placemcnt of subsequcnt litis. All structurai fill underlying building ttreas <br />should bc con,pacted to at Icast 95 percent of its mnximum dry dcnsity. Maximum dry dcnsity, in this <br />rcport, rcfers to (fiat dcnsity ns determined by tlic ASTM D 1557 compaction tcst procedure. Tl�e <br />moisture cuntent of Oie soils ro Uc compncteJ should be within about 2 percent of optimum, so that n <br />rcadily compactable cundilion cxisls. It may be necessary to overexcavate nnd remove wet soils in cases <br />whero drying to a compnctaUle candition is nol feasiUle. All compaction should bo nccomplished by <br />cquipment of a type and size s�ifficient to a[iain the desired degc��e uf compaetion. <br />RMI ASSOCIATES LLC <br />G <br />•d 6ST9-6�9 fD9E1 s��az?y��d P1N su9tsa❑ d9S°EO LO 60 JeW <br />