My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1311 MADRONA AVE 2016-01-01 MF Import
>
Address Records
>
MADRONA AVE
>
1311
>
1311 MADRONA AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 12:17:37 AM
Creation date
2/17/2017 10:45:22 PM
Metadata
Fields
Template:
Address Document
Street Name
MADRONA AVE
Street Number
1311
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,� <br />� <br />6. <br />� � <br />PUBLIC WORKS PERMIT COMMENTS <br />Connect side sewer per City Standard #601. <br />Connect side sewer per City Standard #'s 601, 602, 604. <br />Connect all rooftop downspouts to the side sewer. <br />Connect rooflop downspouts lo the drainage system provided for this Ict <br />Rooftop runoff must be discharged to a roo( downspout infiltration system per City of iverett Storm <br />Manual 3-2 62. The approximate size trench is 3.5' wide, 2' deep and <5 long See a'dachment for <br />more details. <br />/ 9) The contractor must meet with the Public Works Inspectcr to discuss potential drainage routing prior to <br />�� beginning the projecL Cali RandY Allen at 425-339-7403 1l Call Clifi Lindman at 425•339-7404. <br />� <br />� <br />15 <br />16. <br />Install erosion control measures as detemined by the Public Works inspector, such as silt fence, straw <br />bales, swales, or erosion blankets. <br />Install erosion contrcl measures per City of Everett Standards for small parcels <br />Remove erosion control measures upon completion oi the project prior ro final approval of the permit <br />All excavated material from foundation, sidewalk and drive�vays shall be hauled to an approved, permitted <br />site No wasling of material is allowed on ihis building lot. <br />No dirt, mud, rocks or debris to be tracked onto roadway. <br />No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br />open for pedestrian travel. <br />Adjust waler meter box 1" above sidewalk grade. <br />17 Remove and replace curb, gutter and sidewalk as per Cily of Everett Standard Plan #'s 305A & 306 on <br />this proposal's frontage as directed by the Public Works !^cpector (Le. all unused driveways and any <br />broken or damaged area must be replaced). <br />� Install a Type I concrete driveway per Cily of Everett Standard #307W , j-� . p� 5 iJ���� <br />� 9� Pave driveway From the front property line oul to the street paving <br />20 <br />21 <br />r�'. <br />Pave ro existmg paving in alley. <br />Con�acl the Water Dislrict (or connecling provisions for this buildmg's water and <br />sewer services. <br />A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area. <br />23. If a sewer pump system is to be insta!led, the pressure line must discharge into a private manhole, then <br />graviry flow across lhe public right-of-way. <br />24. A sprinkler system is required for this building in compliance wdh the requirements of NFPA Standards <br />13D. <br />Your Public Works Inspector is Clift Lindman. Call him at 425-339-7404 for questions and inspections <br />PI':CommenlslRevlsed618111 � Ia <br />
The URL can be used to link to this page
Your browser does not support the video tag.