Laserfiche WebLink
o ��C�pd� D <br />NQV 0 21994 <br />....r ........................... ........................... <br />CiTY OF EVERETT <br />Bldg. Permit Counter <br />THOMAS D. BIG56Y <br />FRANK R. WILLSON <br />BIGSBV � �y��ucON <br />ATTORNEYS AT LAW <br />4J0 CASCADE FINANtlqL CENTER 1 <br />2ti2B COLBY AVENUE i <br />EVEPETT. WqSHINGTON 9B201 � <br />November 1, 1994 <br />HAND DELIVERED <br />Cti.ty of Everett Public Works <br />Construction Inspection Division <br />3200 Cedar <br />Everett, WA 98201 <br />�: Lida R. Drumheller Residence - 1400 Madrona Avenue <br />Water Diversion £rom Ad'acent New Construction <br />Gentlenen: <br />TELEPHONE 259-5�f � <br />AREA CODE 206 <br />I represent Lida R. Drumheller, who is experiencing severe problems <br />from surface water diverted onto her property as a result of new <br />construction currently in proqress on the adjacent lots to the <br />east. <br />The onset of seasonal rainy weather has resulted in surface water <br />flooding of the Drumheller property. This conditioii ha� not <br />occurred in the 28 years she has resided on the property. <br />It appears that these adjacent lots carry considerable runof% as <br />they form a natural drainage basin. While this su,:face water was <br />previously dispersed without adverse effect, tHe ne.w constructioii <br />has diverted substantial amounts of surface water in concentrated <br />amounta onto the Drumhe].ler property. The immediate problems have <br />heen wash-outs and flooding which raise long term concerns about <br />damage to the foui�,dation of the residence and the integrity of the <br />hillside. <br />I understand that the contractor has taken steps to remedy this <br />problem by tight-lining some of the surface water past the <br />Drumheller residence. Mrs. Drumheller remains concerned that water <br />concentrated in this manner will jeopardize the integrity of the <br />hillside. <br />It is requested that your department take immediate action to <br />require the contractor to address this situation and develop a <br />drainage plan to adequately and safely handle the diverted surface <br />