Laserfiche WebLink
� <br />August 16, 2009 <br />JefT'Heitman <br />Development Technician <br />Engineering/I'ublic Services Dept. <br />Subject: Project: <br />Job Address: <br />Ptan Check No: <br />Dear Mr. 13eilman: <br />Morrison <br />1456 Madrona Ave. <br />B0907-035 <br />LV 1' � � V ��l <br />AUG 1 7 �OG9 D <br />CITY OF EV�RE'fT <br />Permit Servicos <br />In response to your letter of July 30, 2009, which listed several comments concerning the <br />deck plans I submitted. I have revised the plans and hopefully clarified them to sho�v the <br />extent of'the proposed project. <br />Response to each item f'ollows; <br />1. Clarity of construction documents. <br />Revised plans show more detail for the proposed deck project and I believe this <br />will conform the provisions of all applicable codes, rules and regulations. <br />2. Provide details for the following conditions. <br />a. Post/footing connection <br />Page 3, Simpson ABA66Z <br />Page 4, Simpson ABA66Z and ABA44Z <br />Page 5, Simpson A6A4�{7_ <br />U. PosUueam connection <br />P.zge 3, Simpson AC6Z <br />Page 4, Simpson AC6Z <br />Page 5, Simpson AC4'L and LCE4Z <br />a Guard construction (show spacin�; of pickets) <br />See page 6, Spacing of pickets 3 7/8 inch (commercial rail kits) <br />I/ <br />L <br />