Laserfiche WebLink
CIASED CM WOkK ORDERS REPORT <br />Tot31 Utility Maintenance Management System <br />10/18/1994 Page 1 <br />Date Range :10/O1/1992 - 10/14/1994 <br />CM Work Order Range :<Blank> - 8405421080001 Pat`•ern :7101196648419 <br />Item Range :<Blank> - WS+122020001 Pa�tern :* <br />Program ALL Function ALL Activity ALL <br />-------- <br />CM WORK ORDER ID: 71011966 419 Title: SO 2025 AB <br />Item ID: -- N'lain �. <br />Location ID: -' <br />Program 710 Function 119 Activity 554 <br />Date Completed: 02/16/1993 <br />Overall Craft: <br />Issued: 02/11/1993 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL DMJ <br />HEO JRM <br />UL OBJ <br />WSW OMW <br />EO PTN <br />SUP1 WMW <br />Materials: <br />ID <br />ADAP36001247 <br />BOX000045147 <br />CORP36002247 <br />METE36141547 <br />PIPE36060747 <br />SADD44017047 <br />WIRE00119847 <br />Vehicles: <br />ID <br />V2156 <br />V2156 <br />V3156 <br />V2226 <br />V2226 <br />V3505 <br />V3508 <br />Issued by: G3 Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />------------------- <br />DOUCETTE, MARK J <br />JOHNSON, RICHARD M. <br />O'LEARY, BRIAN J. <br />OEHLERT, MICHAEL W. <br />PINON, THOMLS N. <br />WARD, MICHAEL W. <br />Pl.anned Hrs Actual <br />----------- ------ <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Description <br />------------------------------ <br />ADAPTER 1" MIP X INSTA-TITE @ <br />BOX METER CONC W/STEEL LID <br />CORP STOP 1" CCT X INSTA-TITE@ <br />METER 1" PRECISION PMM <br />PIPE 1" POLY I.P.S. <br />SERVICE SADDLE 6" W/1" CCT <br />TRACING WIRE 10 GAUGE <br />Description <br />SVC TR[JCK DODGE 89 <br />SVC TRUCF DODGE 89 <br />SVC TRUCK DODGE 89 <br />DUMPTRUCK FORD 5 YD SS <br />DUMPTRUCK FORD 5 YD 8II <br />BACKHOE CASE 82 <br />BACHIiOE CASE 4X4 88 <br />Hrs <br />1.00 <br />3.00 <br />3.00 <br />3.00 <br />1.00 <br />3.00 <br />'Potal Labor Cost <br />Date # Used <br />02/11/1993 <br />02/11/1993 <br />02/11/1993 <br />02/11/1993 <br />02/l.1/1993 <br />02/11/1993 <br />02/11/1993 <br />1 <br />1 <br />1 <br />1 <br />22 <br />1 <br />24 <br />Total Material Cost: <br />Date <br />02/11/1993 <br />02/12/1993 <br />02/12/1993 <br />02/12/1993 <br />02/12/1�93 <br />02/11/1993 <br />02/12�1993 <br />Hours <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />7.. 00 <br />1.00 <br />Cost <br />12.01 <br />55.92 <br />36.Q3 <br />57.30 <br />15.80 <br />57.30 <br />234.36 <br />Cost <br />10.70 <br />6�.42 <br />23.91 <br />51.92 <br />8.80 <br />11.70 <br />2.88 <br />174.33 <br />Cost <br />5.70 <br />5.70 <br />5.70 <br />10.90 <br />10.90 <br />123.30 <br />22.20 <br />