Laserfiche WebLink
�PPROVAL <br />� VIO� LATION <br />INSPECTION REPORT �c <br />Address ���c� � ������ <br />Contractor� -�---� <br />Owner -- c� t <br />Date ��— � � — /`� <br />J PARTIAL APPROVAL <br />'� CORRECTION REQUESTED <br />� Corrections listed below MUST BE MADE bebre work can be approvcd. <br />�� Please contad inspecror and arrange tor appointment. <br />� Was not able to perform mspection. <br />� CALL 259•8870 FOR REINSPECTION – 24 hour nob,ce requved <br />A CERTIFICATE OF OCCUPANCY SHNLL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />Date L�f_—s�` <br />TYPE OF INSPECTION RE�UESTED <br />J Temp. EIecL J Framing J Gas Fiping <br />'J Footing J Drywall, Nailing J Consullation <br />J Foundahon 'J Shear Nailing J Groundwork <br />�_.l Ductwork J Grid J Struct. Slab <br />J Wood Stove J Rough-in �Final <br />J Service J Insulation <br />J Masonry �J Other — <br />J BLDG: Pmt. No. <br />�IfAECrt-Pmt. No._�v ` K � � — <br />] ELEC: Pmt. No.-- J PLBG: PmI. <br />