My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9300 W MALL DR 2018-01-01 MF Import
>
Address Records
>
W MALL DR
>
9300
>
9300 W MALL DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 11:22:28 AM
Creation date
2/17/2017 11:44:15 PM
Metadata
Fields
Template:
Address Document
Street Name
W MALL DR
Street Number
9300
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br />TO: <br />FROM: <br />DATE: <br />SUBJECT: <br />Calculations: <br />MEMORANDUM <br />Gordon Wit� .er <br />Jane 2immerman <br />January 'L1, 1992 <br />West Mall Village Apts. Plan Review, <br />SEPA #186-89 <br />Detention calculatio�� must be submitted, showing the <br />required volume and allowauie release rate. <br />Wetpond calculations must be submitted showing the total <br />wet pond volume required. <br />Orifice calculations must be submitted showing that the <br />control structure is meeting both the detention and wetpond <br />requirements. A multiple orifice system should be used. <br />The design wetpond volume must be reached or exceeded for <br />the two year, 24 hour storm. As a first guess, the primary <br />orifice should be sized to release approximately the <br />existing two year storm peak and the second orifice located <br />at the elevation relating to the design wetpond volume. The <br />two year, 24-hour storm should then be routed through the <br />pond to verify that the wetpond design volume is being <br />reached or exceeded for the design storm. <br />Current City standards call for vegetated swales to be <br />designed for the 2 year, 24 hour storm peak discharge, with <br />higher flows diverted around the swale. If possible, the <br />swales should be designed with a bypass system. The swale <br />should then be designed per the following criteria for the 2 <br />year, 24-hour storm: <br />"n" = 0.12 <br />max velocity = 1.5 feet per second <br />max. depth = 0.5 feet <br />If diversion is not feasible, the following additional <br />design criteria will apply for the 25 year, 24-hour storm: <br />"n" = 0.035 <br />max velocity = 4.0 feet per second <br />max. depth = 1.0 feet <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.