My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1620 LOMBARD AVE B 2016-01-01 MF Import
>
Address Records
>
LOMBARD AVE
>
1620
>
1620 LOMBARD AVE B 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2017 10:08:26 AM
Creation date
2/18/2017 10:08:22 AM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
1620
Unit
B
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..�__ �-_.. <br /> I <br /> � <br /> �RAL AEpU1RD�iTg � <br /> Adam A. Barger Date: �-28'37 <br /> , <br /> o���c address: 1620-1/2 Lombard Avenue <br /> ehone: (home) 55E-9794 �work) 641-2550 <br /> Legal Description: <br /> The ��orth half of lot 22, all of lot 23 and the south half of lot 24, Block <br /> 337, Plat of F.verett, Division "N", according io the plat thereof, recorded in <br /> Volume 5 of plats, page 7, records of Snohomish County, 4lashington, <br /> except the east 70 feet thereof <br /> situate in the County of Snohomish, State of 4lashington <br /> 1. A11 work noted herein must comply with the standards set forth in the <br /> Building Co3es and Ordinances of the City of Everett. <br /> 2. All material and permits required for this job shall be provided by the <br /> acaatded Contractor and permits sha11 be posted prior Yo start of work. <br /> 3. The Owner shall make no oral corc�itments ot ag=eements with the <br /> Contractor pertaininq to this wock. Any chanqes in the work shall be <br /> made by an Rddendum oc Chanqe Otder and siqned by the Ownez, the <br /> Contractor and the Co�nunity Housing Improvement Proqram Representative. <br /> 4. The premises shall be kept clean and orderly evety day during the coucse <br /> of the work, and all debris tesultinq frcm :+ork shall be �emoved weekly <br /> and upon completion of the wozk. <br /> 5. v The prope=ty will be occupied throuyhout the covrse of the wotk. <br /> _ The pcoperty will be occupied throughout the course of the work, <br /> except for a period not to exceed days. <br /> _ The p:opecty will not be occupied. <br /> 6. "Time of Compietion" - The amount of time alloWed for completion of che <br /> work shall be �p 0 consecutive days. <br /> 7. "Damaqes" - If che wor:t is not completed by the Date oE Co�letion, ia <br /> the absence of a signed Chanqe Ordet or other signed agzeemene becxeen � <br /> the Owner and Contractoc modifyinq the Contract, the Conesaccoc sha12 - <br /> c_edit che Owne= ac the rate of S� per conserscive Cay, IS�Op�i . . . ._ <br />
The URL can be used to link to this page
Your browser does not support the video tag.