Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated _ <br /> 5. Connect side sewer Ner City Standard #601. <br /> ( G. Connect side sewer per City Standard #'s 601, 602, 604. <br /> % 7. --' ConnecYall raoftop downs,poul��lh�sitl�sewer. <br /> 8. Connect rooftop downspouks to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof�iownspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginnina the project. <br /> 11. Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosir�n blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13. Remove erosion control measures upon completion of the project prior to inal approval of lhe <br /> permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauied to an <br /> approved, permitted site. No wasting of material is allowed on this building lo.'. <br /> 15. Remov� and replace curb, gutter and sidewalk as per City of Everett Standarc Plsn #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> drivevdays and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the_ Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Sta�dard Plan #402 with a gas trap per Standard Plan #410 is <br /> requirnd for the parking area. <br /> 20. If a sewer pump syslem is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprirkler system is required for this building in c�mpliance with the requirements of NFDA <br /> Standards 13D. <br /> P17c:,m:nen�s ��� . <br />