Laserfiche WebLink
. <br /> PUBLIC WORKS PERMIT COMCVIENTS <br /> d. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> � 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> �-6er� o op owns �de-seweF <br /> S. Connect rooftop downspouts io the drainage system provided for this lot. <br /> ( 5,) Rooftop runoff must be discharged to a roof downspout infiltration sVstem per City of Everett <br /> - Storm Manual 3-2.6.2. �t�lldtb��Derptt����lgjb��. <br /> �10. A �atch basin as per City Standard Plan #402 �viih a gas trap p�er Standard Plan #410 is <br /> � requiredfortheparkingarea. 1��;1,.Cc � �- 1�c G�w e»d o�' f�ri�e=•�•2i <br /> ., _� rc��, _ , ro ,:�_c•,c�— <br /> 11. Remove and repl:ace curb, gutter and side�valk as per City of Everett Stand�rd Plan ;'s 305A <br /> & 306 on this proposal's frontage as directed b}� the P�blic Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area rr�ust be replaced). <br /> 12. Install a Typ2 I concrete driveway per Ciry of Everett Standard #307. <br /> 13. Pave driveway from the front property line out to tl�e street paving. <br /> 1 d. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> � 16 The contractor must meet with the Public Works Inspector to discuss petential drainage <br /> `-� routing prior to beginning the project. <br /> 17. A sprinkler system is required for this buildina in compliance �vith the requirements of NFDA <br /> Standards 13D. <br /> 18. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> P1';C,:mments 2/� <br />