My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3425 LOMBARD AVE B 2018-01-02 MF Import
>
Address Records
>
LOMBARD AVE
>
3425
>
3425 LOMBARD AVE B 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 7:38:02 AM
Creation date
2/18/2017 10:10:48 AM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
3425
Unit
B
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT <br />❑ Rood ❑ 9 <br />OTHER OR CONSULTATION:.__.. ------ -- <br />❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />OK FOR T.0O. CORRECTION REQUESTED <br />OK FOR C.O. ❑ VIOLATION <br />UNABLE TO PERFORM INSPECTION: <br />CALL (425) 257.8881 FOR REINSPECTION —24 hour notice required <br />❑ .❑ <br />❑ <br />❑ _— ---- <br />❑ <br />' Date U �O <br />/ _Permit: <br />Contractor: <br />Owner. <br />Site Address: <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL <br />BUILDING <br />MECHANICAL <br />PLUMBING <br />❑Temp Service <br />❑LIFER y. .und <br />❑Groundwork/Slab <br />❑Groundwork/Slab <br />❑Groundwork <br />❑Fooling <br />❑Rough In <br />El Rough In <br />❑ Slab/Conduit <br />❑Foundation <br />❑Ceiling Grid <br />❑Ceiling Grid <br />❑ Rough In <br />❑Structural Slab <br />❑ OK to insulate <br />❑ OK to insulate <br />❑Service <br />❑Framing <br />❑Rooftop Units <br />❑ Water Service <br />❑Grounding <br />El Insulation <br />I _ echanical Final <br />❑Medical Gas <br />❑ Ceiling Grid <br />❑Drywall Nailing <br />❑Plumbing Final <br />[—]Electrical Final <br />[]Shear Nailing <br />GAS PIPE <br />SITE WORK <br />❑Roof Nailing <br />El Rough In/Service <br />Hot Water Tank <br />❑ Footing drains <br />❑Ceiling Grid <br />❑Refrigeration <br />❑Rough in <br />I rains <br />Buildin Final <br />❑Gas Pipe Final <br />ElHWT Final <br />JJJ �J _ <br />inspector: �/ _ Date: Y) Q <br />` 7T— TAaAN, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.