My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10306 HOLLY DR 2016-01-01 MF Import
>
Address Records
>
HOLLY DR
>
10306
>
10306 HOLLY DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2017 11:04:21 AM
Creation date
2/18/2017 11:04:08 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
10306
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard #601. <br /> 5. Connect side sewer per City Standarci #'s 6C1, 602, 604. <br /> 6. Connect all rooftop down=nouts to the side sewer. <br /> 7. Connect rooftop downspouts tr,the drainaye syslem provided for this lot. <br /> B. Rooftop runoff must be discharged t��a roof downspout infiltration system per Ciry of Everelt Storm <br /> Manua 3-2.&.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br /> more details. <br /> g. The cortractor must me?t with the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the project. Call Randv Allen at 425-339-7403 // Call Cliff Lindman at 425-339-7404. <br /> �i^ <br /> ,/ i0.' Install erosi�n control measures as determined by the Public Works inspector, such as silt fence, stiaw <br /> L/ bales, swales, or erosion blankets. <br /> �� � <br /> ��, Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remuve erosion control measures upon completion of the project prior to f nal approval of the permit. ' <br /> 13. All excavated material from foundatior, side�valk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this building lot. <br /> 14. No dirt, mud, rocks or clebris to be tracked onto roadway. <br /> 15. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br /> open for pedestrian traoel. <br /> 16. Adjust water meter box 1" above sidewalk grade. <br /> 17. Remove and replace curb, gutter and �idewalk as per City of Everett Standard Plan#'s 305A& 306 on <br /> this proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> / <br /> j 1 g% Install a Type I wncrete driveway per Ciry of Everett Standard#307. <br /> ( 9. Pave driveway from the front property line out to the street paving. <br /> 20. Pave to existing paving in alley� <br /> C <br /> 21. Contact the �i c3 � Water District for connecting provisions for this building's v�. <br /> sewer services. <br /> 22. A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 23. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br /> gravity flow across the public right-of-way. <br /> 2q. A sprinkler system is required for lhis building in compliance with the requirements of NFPA Standards <br /> 13D. <br /> P;;'Goniments I Rev�sed C�18�11 ��� <br /> _.' ,� �.'.�..� '�.yh _.H <br /> ."^� . <br /> - �y)4Y �, a�.:. <br /> �. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.