Laserfiche WebLink
" �) �-, L-1�=�-L��:, _ i <br /> `y�_. <br /> ;� �� / ,�,'� �� � <br /> ;�,� ��� -- �. �� � <br /> PUBLIC WORKS PERMIT COMMENTS I ��i��" " " '��1- <br /> (� � � � ��al��� /�r <br /> 4. Connect side sewer per City Standard #601. <br /> ; Connect side sewer per City Standard#'s 601, 602, 604. <br /> 6. Connect all rooftop downspo�ts to the sidu sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for lhis lot. <br /> g. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> Manual 3-2.62. The approximate size trench is 3.5' wida, 2' deep and 25' long. See attachment for <br /> more details. <br /> 9 1 The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> _- beginning the project. Call Rand Allen at 425-339-7403 // Call Cliff Lindman at 425-339-7404. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remo�ae erosion control measures upon completion of the p�oject prior to fina: approval of the permit. <br /> 13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approvea, <br /> permitted site. No wasting of material is allowed on this buiiding lot. <br /> ,,., <br /> / 14� No dirt, mud, rocks or debris to be trecked onto roa way. <br /> � <br /> 15. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br /> open for pedeslrian traveL <br /> 16. Adjust water meter box 1" above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A & 306 on <br /> this proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> � 18 Install a Type I concrete driveway per City of Everett Standard#307. <br /> � �g Pave driveway from the front property line out to the street paving. <br />�� �� 20. Pave to exis!ing paving in alley. <br />��px�II <br />'" �"` 21. Contact the Water District for connecting provisions for this building's water and <br />��� <br />�;I��� � � sewer services. <br /> �, 22. A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 23. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, lhen <br /> ` , gravity flow across the public right-of-way. <br /> i <br /> � 24. A sprinkler system is required for this building in compliance with the requirements of NFPA Sta�dards <br /> � 13D. / � / <br /> <-�J t /ICt V� t'` S �c,.-.�1�� d �{r/�/C'CLCY-)i \ Of S�A/�-� <br /> ��� c G� (�'t /til � <br /> � PVJCommen�s I Revlsed 618117 �� <br /> .� - - _,.. <br /> �r,,'g�>i� a7 �r� � d. - <br /> _ — S'.. .a� ,'t w An'N '�''3'4'� n'`� ° Fs£t' s� '� '_,�� e"�t ±i�,n <br /> ��r�' � <br /> r y .-�:;�a ' <br /> a�_. � ' <br /> in " ' 'fi <br />��` p. <br /> a� <br /> ' :'�t a <br /> .�� <br /> - �� ��r�y� .�- �, <br /> � <br />