My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10725 HOLLY DR 2016-01-01 MF Import
>
Address Records
>
HOLLY DR
>
10725
>
10725 HOLLY DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2017 11:28:53 AM
Creation date
2/18/2017 11:28:36 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
10725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sevrer per City Standard#601. <br /> 5. Connect side sewer per Cily Standard�'s 601, 602, 604. <br /> 6. Connect all roottop downspouts to lhe side sewer. <br /> 7. Connect rooftop downspouls to the draina�e system proJided(or this lot. <br />� � Rooftop runoff must be discharged to a roof downspout�ntillration system per City of Everell Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide,2'deep and 25'long. See atlachment for <br /> more details. <br /> 9. The conUactor must meel wifh the Public Works Inspector to discuss potential drainage rouling prior to <br /> beginnir�the pro;ect. <br /> 10 Install erosion control measures as determined by the Public Works inspector, such as silt fence, slra�v <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control me3s��res per Ciry of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the permil. <br /> 13. � All excavateu material from foundation, sidewalk and driveways shall be hauled lo an approved, <br /> permiited site. No wasting of material is allowed on this building lot. <br /> 14. No dirl, mud, rocks or debris to be tracked onto roadway. <br /> � No building malerials to be stacked on sidewalks and sidewalrts to be kFpt ciean and open for <br /> pedestrian travel. <br /> 16. Adjust waler meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per Cily of Everett S:andard Plan #'s 305A&306 on <br /> lhis proposal's fronlage as directed by lhe Public Works Inspeclor(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concr;�.�driveway per Cily of Everelt Standard#307. <br /> 19. Pave driveway from lh:�front property line out to the street paving. <br /> 20 Cor,tact the 1�U� _Water Disirict for connecting provisions for ihis building's water and <br /> sewer services. <br /> 21. A catch basir as per City Standard Plan#402 with a gas lrap per Slandard Plan t,410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is lo be inslalled, lhe pressure line musl discharge into a private manholc, then <br /> gravity flow across lhe public right-of-way. <br /> 23. A sprinkler syslem is required for this building in compliance with lhe requirements of NFDA Standards <br /> 13D. <br /> FOR PUBLIC WORKS INSPECI'�ON, CALL RANDY AT 425-339-7403/CLIFF AT 425-339-7404 <br /> Pc;ca�m_���s <br /> 1 <br /> �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.