My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10830 HOLLY DR 2016-01-01 MF Import
>
Address Records
>
HOLLY DR
>
10830
>
10830 HOLLY DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2017 11:32:57 AM
Creation date
2/18/2017 11:32:49 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
10830
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMfT CONiMENTS � <br /> 4. As per Public NJorks approved plan dated <br /> 5. Con�ect side sewer per City Standard #601. <br /> 6. Conner,r side sewer per City 5tandard r's 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side �awer. <br /> 8. Connect rooftop downspouts to th�� drainage system providad for this lot. <br /> �� Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> J Storm Manual 3-2.6.2. Width �, Depth�, Length�. <br /> e contractor must meet with the Public Works Inspector to discuss potential drainage <br /> � routing prior to begirning the project. <br /> 11. Install erosion control measures as determined by the Public Works inspector, such as sili <br /> fence, straw bales, swales, or erosion blankets. <br /> � Install erosion control measures per City of Everett Standards for small parcels <br /> 13 Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> 14! II excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan r's 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard �307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the��� 1� Water District for connecting provisions for this building's <br /> wzter and sewer se dlces. <br /> 19. A catch basin as per City Standard Plan K402 with a gas trap per Standard Plan »410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow a.^.ross the public right-ef-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> ..__,.��_,�� , � <br /> r . <br />
The URL can be used to link to this page
Your browser does not support the video tag.