Laserfiche WebLink
.,-�- ' "E:s �+. ��i,°fi4'�rde �'.� .�v �'� . � .z.,>, : <br /> ..:COMPLIANCE �y,ie��;�`r�,.,,'�,.�t7/ A '"°" J�!"'r O . <br /> REOl1IRED � -- sr u_t n + ✓� � , <br /> � � •;; �n ���� .,. <br /> �iv a-i?N�.�C}',� e,✓,�,o�H T+F'r <br /> �F' � <br /> �.�..••�: ..vn��.: �r < ✓'.^'S <br /> INSPECTION <br /> APPROVED I�•1PORTANT: Please supply Informatlon In the shaded boxes and check the appropriate <br /> � Grcles. Dlsregard topics that don't desoribe your bullding or equipment.I24�tQI place <br /> checks In the two left coiumns. <br /> Ms <br /> ❑ p QQ Exterlor slab Insulatlon, ii nof located on the rnterior, shall be R-10 (Table 6-2). <br /> p p �Exterlor slab insulation, i(present, shall 2pproved for below grade use and protected above grzde. <br /> p p �a .Walis, inGuding rim joists, shall ;�e insulated without compression ta (Tabie 6-2}: <br /> �R-15 batt (Options I,il) �9-19 (Option IlI, IV,V, VI,Vlq <br /> � p Qlnterior befow grad2 walis shall he insulated without�ompression to {Table 6-2): <br /> CjR-15 (Options I, 11) �R-19 (Cptions III, !V, V,VI,VIIj <br /> ❑ ❑ Q1�aulted ceilings shall be insulated with�out compressior• to ft-30(l able 6-2, All options) <br /> p p �i Skylight wali Insulation is installed and equivaient to the required v.�all R-values above. <br /> p ❑ Q Vapor retarders shall be instailed toward the warm surtace as reoreser��d belovi (502.1.6): <br /> Select one cption!or iloors, watis, and 2ppropriate ceilings: ' <br /> Fioors: � Plywood W/exterior glue �Poly {a 4 Mil) Q Backed batts <br /> Walls: �Poly plastic (a 4 Mil) � Face-stapled, backed batts � Pb'A paint <br /> Ceilings: Not r�Guired erhere ver,t la;ion spaca averages >32'abaie insulation. � <br /> ��ace s?aplad baCked bat?c JF'oly plas;!c !�. =.' � ii) (J FVA pairt <br /> O ❑ QHeatlng system of;iclency and sizing requirements shall be me; us iepresented 6alow: <br /> ❑ ❑ Q Heat Pump efticlency shall Ce met urder the foliowing compli2nce patt? (S. 5U3.4): <br /> 0 Split system, air source heat pump: HSPF z 6.8, COP >3A <br /> � Singla package, air source heat pump:HSPF a 6.6, CQP > 3.G <br /> � Water source heat pump: COP� 3.P <br /> (� Gwund source heat pump COP� 3.0 <br /> ❑ ❑ Q Central force•air furnace AFUE rating, as listed in the GAMA Director�, shall be: <br /> U� .79 (Options I, it, IV, Vi,VII) v : .6s (Option III)) G:�r4 (Option V) <br /> ❑ ❑ �Non-central, combustion heating systems shali have intP.rmitent ignition <br /> ❑ ❑ � Maximum heat(ng system output {150°!0 oi design heat Ioad) is BTU;hr. {S. 5G3.�.2) <br /> p p s High etiiciency torced-alr turnace (s 56,000 BTU,�hr.output}may may exceed 150°'�ot GHl <br /> because: QGAtdA listed AFUE is z 78 + t per aach 5000 BTUJhr output Ihat it exceeds 1he DHL. <br /> WSEC Insulation phase requirements: <br /> Inspected by:_ Date <br /> ;�� � <br /> ° _.. . . ...._ <br /> ❑ ❑ Q Envelope Fioors shall be insulated wlthout compression, and wiih support s 24"O.C.to: <br /> �Rt9 (Option; I, II, III, IV, V) Q R25 (Opiions VI, Vii} <br /> � � ro Non-vaulted, attic cellings shail be insulated without compression to: See Table 6-2 <br /> ��R-30(Options I, II, ill, IV, V, Viq Q R38 (Opt(on Vf) <br /> � � Qi Door systems shall meet:�U.40 (AII optior�s) <br /> Uoor types are i71-- {2) (3) <br /> Page 5 of 6 <br />