My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8620 HOLLY DR 2018-01-02 MF Import
>
Address Records
>
HOLLY DR
>
8620
>
8620 HOLLY DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2023 7:09:34 AM
Creation date
2/18/2017 11:52:13 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
8620
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> .i <br /> � r�� � � �r(i!)l4 -� Ci � � -1 ir"nlrlfr� /JffScl'� ,; <br /> l <br /> INIRODUCTTON AND EXISTING CGNDITIONS: � <br /> ... <br /> fhis project will construct a faciliry for CCI�Analytical Labs, Inc. at 8520 Holly Dr., near the <br /> interseciion of Holly Drive and 3rd Ave SE. The property is in a heavily developed azea, and is <br /> virtually the only azea that has not been developed:...Vegetation on the site consists of grass and <br /> brush. in general, the site has a mild slope from the northeast_ to the southwest. There is <br /> somewhat of an existing man-made (soiry Jane—not to be chau—n s`tie, person-made) <br /> ditch/depression near the center of the property. There'is also_a spoil-pile (approximately four <br /> feet high) Reaz the southeast property comer. Soils on the site are classified by the Snohomish <br /> Counry Soil Survey as Alderwood Urban Land Complex (Hydrologic Group `C'). These soils <br /> have the chazacteristics of being moderately deep with moderate permeability above the hardpan <br /> and very slow through it. Runoff is slow and the hazard of water erosion is slight. <br /> DEVELOPED CONDITIONS: <br /> The project will construct a laboratory building, asphait parking lot, frontage improvements, and <br /> storm water controls. Access to the site will be from the north side of Holly Drive. The <br /> developed site wili slope towazds the southwest comer of the property, where storm runoff from <br /> the parking lot will be collected in a detention vault. Runoff from the roof of the proposed <br /> laboratory will be collected in a downspout at the southeast corner of the structure, and ti�htlined <br /> to tte detention structure. Holly Drive slopes from the northeast to the southwest, and the access <br /> into the future laboratory will slope down to the north away from Holly Drive. Hence, runoff <br /> from the project frontage will flov; towards the site access, then into the parking azea and <br /> towards the vault inlet. Runoff south of the access will not be collected and will flow to the <br /> southwest along the gutter line, and be collected by a catch basin alons the adjacent property's - <br /> frontage. <br /> The storm water management system is comprised of two basic components: a wet vaelt and a <br /> water quality pond. Runoff from the pazking will enter the vault via an access riser with an inlet <br /> ' rR'. _ <br /> grate in the northwest corner of the vault, directly into the first of two cells. The first cell of the <br /> vault has both live ar.d dead storage. The dead storage component provides pre- <br />}�� �+, treatmendsediment removal for the six month design storm event, ar.d has dimensions of 3 ft(d) <br />��� ' x 15 ft(w)x 40 ft(f) (1,800 ft3). 1 he total volume of runoff generated during the sir, month storm <br /> '�� under developed conditions is 1,589 ft'. As the maximum allowable percentage of the six month <br /> storm that can be retained in the wet vault is 85% (or 1,351 ft' = SS% of 1,589 ft3), additional <br /> retention (>_ 240 ft') will be provided in a water quality pond downstream of the vault structure. <br /> Above the dead storage in the vault is 2.85 ft (including 0.5 ft of freeboard) o:live storage. <br /> Influent will pass from the first cell to the second cell via a knock-out in the baffle/support wall <br /> near the south end of the vault. A flow restrictor has been designed to release detained storm <br />' ,: .i <br />� . water at 50% oF the two year and ]00% of thc 10 and ]00 year storm event under pre-developed <br />� ?� conditions. <br /> :3 �- Downstream of the vault is a water quality pond that provides an additional 380 ft3 of retention. <br /> The combined volume retained in the vault and pond is 2,180 ft3, which exceeds the required <br /> � < retention volume of 1,589 ft3. The pond has side slopes of 3H:1 V, and a total depth of twe feet. <br />�' ' C� <br /> �:uzc��c�a�s.--`oo�as amos-n.ao: 3 <br />�� ; <br />� x:� <br />� "`.^�tta�'--p..tY�s� _ �n ✓��:. ��:.,,y ""?"'S� �_�� k� ��' -_ � <br /> ��' eM1+f6ipM eu„�'°"�i+"!.w+ . `;+.r�rtn�a}epi4,/y �f'��`'�,+b}�i�'���'���„p'�s <br />�` � . � y.2�ts'�iN4�.ry9'�fl`K$' f.aLfiM„}� ��� �",yI,Y�"'"�.,.w <br />+���,.�M^�^' . ._._.._.. ..� _ _.. -��'��'-'-" Y �� -, �.�5�n`. <br /> r+z+� <br />..,��.�. 3i. _�- . �f��J'�'.b . e.�...._ . . _ ` <br />
The URL can be used to link to this page
Your browser does not support the video tag.