My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9212 HOLLY DR 2018-01-02 MF Import
>
Address Records
>
HOLLY DR
>
9212
>
9212 HOLLY DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 2:36:17 PM
Creation date
2/18/2017 12:34:28 PM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
9212
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />1 <br />I <br />L1 <br />H <br />1 <br />I <br />I <br />I <br />1 <br />R <br />1 <br />11 <br />H <br />n <br />Page 3 of 29 <br />1. Project Overview <br />The project site is located in the NE '/4 of Section 13, township 28 north, range 4 east, <br />W.M. at the intersection of 92 St SW and Holly Dr. in the City of Everett. See Figure 1 — <br />Vicinity Map, for a detailed map of the project location. The site is currently the Holly <br />Vista Mobile Home Community containing 54 mobile home lots. The proposed project <br />will include 50 condominium units with curb, gutter, sidewalk, water, sewer, and storm <br />drainage improvements. Half street frontage improvements are proposed for Holly Drive <br />along the property frontage. The frontage improvements will widen the paved half <br />surface to 18-feet with curb, gutter, sidewalk and storm drainage. See Figure 2 — Site <br />Plan, for the complete site layout. <br />Detention is not required for this property because it is a "redevelopment' project. <br />However, water quality is required. Storm water runoff will be conveyed to a water <br />quality facility in the south-east corner of the property. Water quality mitigation will be <br />achieved by the use of a storm filter canister system (Stormfilter* by Contech Stormwater <br />Solutions, Portland OR). Pretreatment is required with this water quality -op 'on. The <br />pretreatment option selected for use with the Stormfilter`' vault is the Aqua -Swirl® —by <br />AquaShield, Chattanooga, TN. A flow splitter will take the pretfeatment-'and" water <br />quality facilities offline when the water quality design storm is exceeded. <br />This site is located within the North Creek Sub -basin of the Lake Washington Watershed. <br />r,. <br />The soils are Alderwood till (see soils exhibit in the Appendix). <br />i <br />JUr ec <br />a <br />LJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.