My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9212 HOLLY DR 2018-01-02 MF Import
>
Address Records
>
HOLLY DR
>
9212
>
9212 HOLLY DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 2:36:17 PM
Creation date
2/18/2017 12:34:28 PM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
9212
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />Page 27 of 29 <br />VIII. Miscellaneous Forms and Worksheets <br />1 CONVEYANCE SYSTEM ANALYSIS AND DESIGN: <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I" <br />I <br />I <br />Flow Frequency Return Periods for Developed Mitigated <br />Return Period <br />Flow(cfs) <br />2 year <br />0.650203 <br />5 year <br />0.935714 <br />10 yaar <br />1.145537 <br />25 year <br />1.434644 <br />50 year <br />1.667723 <br />100 year <br />1.916248 <br />The conveyance system for this project is all 12-inch. The 25-year storm (1.43 cfs) will <br />require approximately 0.3 feet of head to convey. A 12-inch pipe at 0.5% slope can <br />convey 3.5 cfs before headwater is 1.5 feet deep. Therefore, the 12-inch pipe is adequate <br />through out this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.