Laserfiche WebLink
Ins ep ctionTvoe Dale Res�ilt Remarks <br /> 9523 HOLLY DR <br /> Pe�mih C0711-015 Status: EXTENDED Issued: 9/79108 Finaled: To Records: <br /> Description: NEW HOUSE- BASIC 313 <br /> Notes/Conditions: 2006 zac, w5Ec6 wsvznqc <br /> PlbgWaterLine 7/14/10 PartialApproval Waler service-see notes <br /> This inspection for water service to 4 buldings covered under permits: <br /> C0711 012 (9511 Holly Dr) <br /> C0711-013 (9515 hlolly Dr) <br /> C0711-014 (9519 Holly Dr) <br /> C0711-015 (9523 Holly Dr) <br /> 2"Water service ok and service to 4 buildings ol< <br /> Call for inspection on car wash and check valve <br /> "'Hard copy of notes is on Inspection Slip for permit C0711-012- 9511 Holly Dr"' <br /> Final Mech 7/7/10 Corr Reqd Do not call until work is complete <br /> MechRoughln 7/8/10 Approval As per notes <br /> Rough in Mechanical ok as noted: <br /> 1. Complete 1"clearance for B-vent in attic <br /> 2. Do not insulate at B-vent under stairs-must have 1"clearance to combuslibles <br /> GasPiping 7/8/10 Approval Rough in gas piping ok at 16 Ibs <br /> Framing ?/9/10 PartialApproval See noles <br /> Partial approval as noted: <br /> 1. Need plans/permit on site <br /> 2. Mechanical, Plumbing- rough in need sign of(Cefore cover <br /> PIb�Roughln 6/29/10 Plumbing rough ok- no permit <br /> StructSlab 7/2/10 Approval As per notes <br /> Inspected structural steel- rebar#4 &thermal �nsulation R-10 perimeter-ok lo cover <br /> ShearNailing 6/21/10 Unable to inspect-need engineering <br /> ShearNailing 6/21/10 Approval <br /> !I PlbgGrWork 4/23/10 Approval <br /> 1 StruclSlab 4/7/10 Corr Reqd Consult-see notes <br /> Please provide GeoTech Report for the struclural fill that has been placed to support the"Ground <br /> Slabs" per section R-403 IRC <br /> f UFER Ground 3/17/10 Approval <br /> Footing 3/17/10 Approval ,� <br /> �� <br /> Foundation 3/17/10 Approval ,;� <br /> Inspected Foundation Walls-approved as per plans and as noted: , <br /> 1. Contractor will complete stem wall rebar installation as per plans <br /> 2. Align rebar to center of forms r�;� <br /> UFER Ground 2/26/10 Approval Contractor installed UFER Ground ; ,;� <br /> Ff�•x <br /> S1MMcleod\Crystal\Lanc7sv,r'r,HollyDcrpt 12/29/2010 Page 10 of 17 rr� <br /> y' <br /> tai <br />� <br />( '1.. — — _ . ... . � ,�,<: il. .. �°'F t`1.�[-a`y�..r.tv� <br /> 3'�: ���5.. L'fg �py�' .. a. Y��• i � �� / "'XC.'d" ` � <br />�k � �•� �� rt�,� AIL�� �'�{. .-y ''. <br /> t��_y :. '�� ,� , ?" �.�� K��u: � 'Y :2 - ;� <br /> 0 <br />� .t=' �" _q `, .y c`n �y �� <br /> .. � , <br /> .�,,. - -. 1,_ .._ ugr,,��.�t� <br />