My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9615 HOLLY DR 2018-01-02 MF Import
>
Address Records
>
HOLLY DR
>
9615
>
9615 HOLLY DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 3:11:58 PM
Creation date
2/18/2017 1:02:15 PM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
9615
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTINIATE SHEET <br />Receipt # <br />I <br />Cost of Work Order <br />Cost of Service Order <br />Contact Person <br />COPV <br />Public Works Department <br />Utilities Division, 5200 Cedar Street <br />Everett, Washington 98201 <br />(425)257-8800 <br />Date Paid <br />Work Order # <br />3,558.00 Service Order # <br />Telephone # 775-825-7008 <br />Requested By Gordon Witcher Date of Request 2-4-00 <br />Property Owner (name) _ CanddlA Development <br />Charge Cost to (name if different than owner) _ <br />Address 988 Leah Circle City Reno, NV Zip 89511 <br />Instaliatior, Location 9615 Holly Dr <br />Installation type/description/size/etc. #1 — 6" fire service. Expose existing 8", hot tap and install control <br />valve Install 6" DCDA in contractor installed and piped through vault. Make final connection after <br />purity. <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />Please notifv the City of Everett Utilities Ditgsion 10 working days in advance of required installation date io <br />allow for scheduliinnand parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the instzdlation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METER53nAND LARGER MAY HAVEA 51X TO 10 WEEKLEAD TIME, <br />Material <br />Labor and Benefits <br />Equipment Rental <br />TOTAL <br />2,518.00 <br />675.00 <br />365.00 <br />$3,558.00" <br />cc: Bldg. Permit Center <br />Clair Clivers <br />Tom Thetford <br />Kirk Brooks <br />Gordon Witcher <br />Dan Lowell <br />Stan Mitchell <br />Paul McKee <br />Gerry Crum <br />Alan Locke <br />- If put in contractor installed and piped through vault. If City installed vault price will be <br />$7,898.00. Recommend "Utilities" A675WA vault with 57-TL-332P lid. <br />Prepared by: Ge <br />Accepted by: <br />Crum <br />Est. <br />Prepared: I Representing: <br />
The URL can be used to link to this page
Your browser does not support the video tag.