My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9700 HOLLY DR 2018-01-02 MF Import
>
Address Records
>
HOLLY DR
>
9700
>
9700 HOLLY DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 3:54:38 PM
Creation date
2/18/2017 1:10:02 PM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
9700
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION FCR DEVELOPER: <br />1. Detailed drawings in accordance with City Design and Construction <br />Standards shall be submitted to the Public Works Department <br />showing site parking layout, landscaping, utilities, storm drain- <br />age, temporary construction erosion control, and all required <br />improvements in the public right-of-way. Public Works <br />Department approval of these drawings is required prior to any <br />permits being issued. All improvements shall be completed, <br />approved, and warranted before the occupancy Permit is issued. <br />2. City streets and alleys are to be kept clear of dirt and debris <br />at all 'times during construction. Dust suppression and street <br />craning must occur as directed by the Public Works inspector. <br />Performance guarantees are required for the curb, gutter and <br />sidewalk. <br />4. Permits must be obtained for all fill removed from the site and <br />placed within the City limits. It takes about 35 days (a SEPA <br />review) to obtain permits for any specific site. There is <br />currently a lack of adequate permitted fill sites within the <br />City limits. <br />5. A ore -yeas guarantee is required on the public street, utility <br />and site landscaping for an amount not less than lot of the cost <br />of construction and shall run for one year from the date of <br />issuance of the first Occupancy Permit for the project. <br />6. A two-year guarantee is required for private retention/detention <br />or other drainage treatment/abatement facilities serving areas <br />larger than one acre. <br />7. On -site watermain will be staked within an easement to the City. <br />The easement will be submitted to the City prior to the issuance <br />of permits. <br />8. As-builts of storm sewer, sanitary sewer, and water systems will <br />be required tj be submitted per City design and construction <br />standards and specifications. <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.