Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated n�,`��� <br /> 5. Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> � Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of�verett <br /> Storm Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2' deep and 25' Iong. See <br /> attachment for more details. <br /> 10. The contractor must meet with the Public 1Norks Insoector to discuss potential d�ainage <br /> routing prior tu beginning the project. <br /> 11. Install erosion control measures as determ;ned by the Public Works inspector, such a� �ilt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. install erosion control measures per City of Everett Standards for small parceis <br /> 13. Remove erosion controi measures upon completion of the project prior to final approval of the <br /> permit. <br /> ti4. All excavated material from foundation, sidew, lk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on ihis building lot. .- cu,- ui�- �� <br /> �o •(ill bt.l,�i�� Ck�-hs'. ;"r <br /> 15. Remove ar.d replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A � <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> �18� Contact the h� " Kil��' Water District for connec,ing provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for:he parking area. <br /> 20. �f a sewer pump system is to be installed, the pressure line must discharge into s private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21� A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> � Standards 13D. <br /> P�JC�;nT.er:s � <br /> (�� <br /> _ . . ..::. -�. . <br /> � _�u.,::�:� �� <br /> si, <br /> e <br /> i .. 'u� ' <br />�— <br />