Laserfiche WebLink
�� STORM\VA'1'[R SITL PLAN DLCEMB[R 19, �005 <br /> i <br /> N[W CLNTURY VILLAGE PAGL 18 <br /> I X. MAINTENANCE AND OPERATIONS IiEQUIREi�IENTS <br /> EROSI�3N CONTROL MAINTENANCE <br /> Erosion and sedimentation control facilitics shall be inspected nt regular intervals for damage and <br /> � sediment accumulation. At a minimum, the facilities shail be inspectcd weekly and after any <br /> runoff-producing rain event or daily during prolonged rainfalL Routine inspections shall take <br /> placc at thc ci.d of cach work wcek and any nccdcd repairs be complcted before the job is shut <br /> � dowu for the weekend. Repairs to TESC measures damaged by stonn events shall take piace <br /> prior to other site work. TESC inspcctions shall continue at thcse intervals during periods of <br /> work stoppages or until permanent cover has becn cstablishcd. <br /> I <br /> 1. Filter Fabric Fencing: Scdiment should be removed when it reaches 1/3 the height of the <br /> � fence. <br /> 2. Storm Drainage Inlct Protcction: Removc and replacc clogged filter fabric bags without <br /> � allowing sediment to enter the storm drainage system. <br /> �� STORDI DRAIN SYSTEM MAINTENANCE <br /> GencraL• <br /> 1. Proper maintenance of public anu private stomnvater facilities is necessary to insure they <br /> scrve thcir intended function <br /> 2. Drainage systems shall be inspected at Ieast annually. A representative of the local <br /> government shall also inspect private facilities at least anmially to insure compliance by the <br /> I owner of the following maintenance requirements. <br /> � 3. Any detcrioration thrcarening the structural integrity of the facilitics shall Ue in�mediately <br /> repaired. Thesc include such things as rcplacement of cican-out grates, catchbasin lids, and <br /> rock in emergency spilhv�ys. <br /> �3. Waming signs (c.g. "Dump No Waste - Drains to Ground Water", "Streams", "Lakes" etc. ) <br /> I shall be painted or enibussed on or adjacent to all storm drain inlets. They shall be repainted <br /> as needed. <br /> 5. Debris shall be rcgularly removed from surfa�e basins used for cither peak-rate control or <br /> stormwater trcahnent. <br /> 6. Parking lots shall be swept �vhen nccessary te rcmove dcbris. <br /> d.����s���e�cprwoac+.av e�o,�u i+o�s.,�y e:.asa•��,a��asessa�ve+c��.i�rv ooc D W H/srm <br />